Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
10 June 2021 | Story Dr Cindé Greyling | Photo Supplied

A brand-new modular space for students was recently completed on the University of the Free State Bloemfontein Campus. The Modular Lecturing Space and Assessment Centre is a bold step to engage with the changing academic environment. It is an example of how collaboration between UFS faculties, the Centre for Teaching and Learning, ICT Services, and University Estates can create cutting-edge and innovative learning and teaching environments.

One space, many functions

The centre, which took 22 months to complete, consists of innovative multi-functional spaces that can be used for large- and small-scale lectures or group work. The biggest venue, which can accommodate up to 980 students, can also be converted into five acoustically separate venues with a variety of table configurations depending on the educational needs. 

In line with the newly adopted blended learning approach, the digital infrastructure in the centre allows for the seamless integration of technology, as all the spaces are equipped with state-of-the-art audio-visual equipment. The computer laboratory and assessment centre, which can accommodate 800 students, can be used for examination or teaching and can be divided into two separate areas if needed. 

Functional study stops 

The centre offers an area where students can pause and study in groups around tables with a laptop-friendly study ledge that runs along the length of the space. Sufficient power points allow students to recharge their devices in an aesthetically pleasing space that promotes optimal engagement with learning. 

The design brief for this multifunctional space was a collaborative effort between professionals and UFS departments to ensure the most efficient use of space and purpose. The overall focus was on effectiveness and efficiency, which is part of University Estates’ strategy to maximise the use of space.

More to this than meets the eye

The building integrates into its environment with waterwise gardens and numerous indigenous trees planted around the permanent outdoor seating, which can also be used as informal learning spaces. The landscaping is seamlessly accessible with ramps and tactile paving. 

Modern, fully inclusive ablution facilities can accommodate high volumes of traffic, and rainwater is collected in 44 tanks with a capacity of 79 000 litres for watering the landscape, as well as emergency water supply to flush water closets. Heat pump air-conditioning systems with individual control for each room are connected to the campus building management system for effective energy control. 

Further expansion

Phase 2 of the project will entail a 24/7 study space that will accommodate 250 students. The venue will also provide a small recreation area. Completion is scheduled for December 2021.

Although the project team was faced with COVID-19 restrictions during construction, they managed to complete the building within the agreed budget and quality measures. The team is looking forward to creating more functional spaces on the UFS campuses. 

Take a tour of the new Modular Lecturing Space and Assessment Centre Building:

News Archive

Forensic investigation at UFS Computer Services division in final stage of finalisation
2007-02-01

Statement by prof Niel Viljoen, Chief Director: Operations  
 
The case in which possible irregularities were investigated at the University of the Free State’s (UFS) Computer Services Division at the end of 2005, and which led to two Deputy Directors’ compulsory leave pending an investigation, is making good progress and is in the final stage of finalisation.
 
One of the Deputy Directors resigned unconditionally a day before his disciplinary hearing was to take place. He is one of two staff members who were placed on compulsory leave after an internal investigation ordered by the UFS management indicated possible irregularities in the division.
 
“As a result of the extent of the case and the involvement of more than one local business, the investigation had a long course,” said Prof Viljoen.
 
“The Deputy Director who resigned would have appeared before a disciplinary committee with Judge Joos Hefer as chairperson on charges of misconduct, involving more than R500 000,” said Prof Viljoen.
 
“We are going ahead with the process of criminal prosecution against this person and a docket was opened at the commerce branch of the South African Police Services (SAPS).  A civil action to recover damages from him was started,” Prof Viljoen said.
 
With a couple of exceptions, the internal disciplinary process of the other persons involved in the case is also finalised. “The disciplinary hearing of the Deputy Director, who is still in the service of the UFS’s Computer Services division, is scheduled for May 2007. This person is still on compulsory leave,” Prof Viljoen said.
 
“To demonstrate our commitment to the enhancement of honest work ethics and to give to personnel and students a mechanism to bring any unethical business practices to the attention of the UFS management, a fraud hotline was installed last year. The hotline is operated 24 hours a day for 365 days of the year by KPMG,” Prof Viljoen said.
 
Prof Viljoen thanked everyone who was involved in the investigation for their cooperation. This includes staff as well as people from outside the UFS.  “We are committed to transparent corporate management. Any possible irregularities will be investigated and if staff or students are found guilty of any irregular behaviour, strict actions would be taken against these persons,” Prof Viljoen said.
 
Media release
Issued by: Lacea Loader
Media Representative
Tel: (051) 401-2584
Cell: 083 645 2454
E-mail: loaderl@mail.ufs.ac.za
2 February 2007
 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept