Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
10 June 2021 | Story Dr Cindé Greyling | Photo Supplied

A brand-new modular space for students was recently completed on the University of the Free State Bloemfontein Campus. The Modular Lecturing Space and Assessment Centre is a bold step to engage with the changing academic environment. It is an example of how collaboration between UFS faculties, the Centre for Teaching and Learning, ICT Services, and University Estates can create cutting-edge and innovative learning and teaching environments.

One space, many functions

The centre, which took 22 months to complete, consists of innovative multi-functional spaces that can be used for large- and small-scale lectures or group work. The biggest venue, which can accommodate up to 980 students, can also be converted into five acoustically separate venues with a variety of table configurations depending on the educational needs. 

In line with the newly adopted blended learning approach, the digital infrastructure in the centre allows for the seamless integration of technology, as all the spaces are equipped with state-of-the-art audio-visual equipment. The computer laboratory and assessment centre, which can accommodate 800 students, can be used for examination or teaching and can be divided into two separate areas if needed. 

Functional study stops 

The centre offers an area where students can pause and study in groups around tables with a laptop-friendly study ledge that runs along the length of the space. Sufficient power points allow students to recharge their devices in an aesthetically pleasing space that promotes optimal engagement with learning. 

The design brief for this multifunctional space was a collaborative effort between professionals and UFS departments to ensure the most efficient use of space and purpose. The overall focus was on effectiveness and efficiency, which is part of University Estates’ strategy to maximise the use of space.

More to this than meets the eye

The building integrates into its environment with waterwise gardens and numerous indigenous trees planted around the permanent outdoor seating, which can also be used as informal learning spaces. The landscaping is seamlessly accessible with ramps and tactile paving. 

Modern, fully inclusive ablution facilities can accommodate high volumes of traffic, and rainwater is collected in 44 tanks with a capacity of 79 000 litres for watering the landscape, as well as emergency water supply to flush water closets. Heat pump air-conditioning systems with individual control for each room are connected to the campus building management system for effective energy control. 

Further expansion

Phase 2 of the project will entail a 24/7 study space that will accommodate 250 students. The venue will also provide a small recreation area. Completion is scheduled for December 2021.

Although the project team was faced with COVID-19 restrictions during construction, they managed to complete the building within the agreed budget and quality measures. The team is looking forward to creating more functional spaces on the UFS campuses. 

Take a tour of the new Modular Lecturing Space and Assessment Centre Building:

News Archive

R8,2-million boost for UFS Qwaqwa campus
2004-08-27

The management of the University of the Free State (UFS) has approved an allocation of R6,8-mililon for upgrading of residences and R1,4-million for other upgrading of the UFS Qwaqwa campus.

According to the Head of the Qwaqwa campus, Prof Peter Mbati, the management also decided that a maintenance manager should be appointed, who will be responsible for dealing with routine maintenance on the Qwaqwa campus.

Prof Mbati said these developments were a major step forward for the Qwaqwa campus as it once again showed management’s commitment to the campus which was incorporated into the UFS in January 2003.

“We can systematically begin to tackle the huge backlog of needs – in terms of maintenance and upgrading – that has built up over many years.

“The new maintenance manager – once appointed – will also ensure that we shorten the turn-around time for addressing routine maintenance issues and in this way improve service delivery on this campus.

“This is not just a financial boost for the campus but I view it as a major boost for staff and student morale. With this commitment from management, staff and students should also commit themselves to the future of this campus,” Prof Mbati said.

Media release
Issued by: Lacea Loader
Media Representative
Tel: (051) 401-2584
Cell: 083 645 2454
E-mail: loaderl.stg@mail.uovs.ac.za
27 August 2004

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept