Latest News Archive
Please select Category, Year, and then Month to display items
18 October 2021
|
Story Dr Nitha Ramnath
Our podcast guest
Prof Jeandrew Brink holds the post of Associate Professor in the Department of Mathematics and Applied
Mathematics within the Faculty of Natural and Agricultural Sciences at the University of the Free State. Her areas of interest include an analytical interest in Einstein field equations, dynamical systems, algorithms for testing general relativity
and the no-hair theorems, black holes, and gravitational waves. Prof Brink registered for a Bachelor of Sciences in 1998, continued with honours studies in 1999, and completed her master’s degree in 2000. Prof Brink’s research is on various
theoretical aspects of testing general relativity. She is a member of the MeerKAT telescope team that times and detect pulsars. She is also working with members of the Laser Interferometer Gravitational-Wave Observatory (LIGO) to find ways of using
gravitational waves to test Einstein’s theory.
Prof Brink was involved in the compilation of a video of geodesic orbits around a Manko-Novikov singularity, selected to be part of a Starmus 3 concert, the proceeds of which went towards promoting the Stephen Hawking Medal for Science Communication and
to support the charitable activities of the Stephen Hawking Foundation. It could also be part of a subsequent documentary.
Listen to the podcast at
François van Schalkwyk and Keenan Carelse,
UFS alumni leading the university’s United
Kingdom Alumni Chapter, have put their voices together to produce and direct the podcast series. Intended to reconnect alumni with the university and their university experience, the podcasts will be featured on the first Monday of every month,
ending in November 2021. Our featured alumni share and reflect on their experiences at the UFS, how it has shaped their lives, and relate why their ongoing association with the UFS is still relevant and important. The podcasts are authentic
conversations – they provide an opportunity for the university to understand and learn about the experiences of its alumni and to celebrate the diversity and touchpoints that unite them.
For further information regarding the podcast series, or to propose other alumni guests, please email us at
alumnipodcast@ufs.ac.za
For all Voices from the Free State podcasts,
click here.
How to interpret Centlec’s load shedding
2008-01-31
Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:
Time slots
See the following table for an indication of times when load shedding might be applied to specific areas: http://www.centlec.co.za/power_shed/PDF/time_slots.pdf
Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf
According to the document, the university resorts under group 4. In the table with time slots it is the grey area.
Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.
Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”
Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.