Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
07 April 2022 | Story By Jóhann Thormählen | Photo ASEM Engage, Hannes Naude
Shimlas
The fullback Litha Nkula scored one of four tries for the Shimlas in wet conditions against the University of Pretoria.

They did have a more conservative plan in the soaking wet conditions, but it was the attacking style of the University of the Free State (UFS) Shimlas that shone through.

According to André Tredoux, the Shimlas Head Coach, his players followed their attacking instinct against the University of Pretoria (UP) on Monday to book a spot in the Varsity Cup semi-finals.

And that is also why the UFS is the team that scored the most tries in the tournament.

The team defeated UP 26-15 in trying conditions at Shimla Park and will finish among the top four. This, even though the Shimlas are still playing the Madibaz (Nelson Mandela University) in Gqeberha in their last league encounter on Monday (11 April 2022).

The UFS is at the top of the log (32 points) and will play in its first semi-final since 2019.

Anxious moments

Many would say an expansive approach is risky when it rains, but the Shimlas proved them wrong this week.

“Our vision for the team is to play according to our DNA (attacking rugby),” says Tredoux.

He admits that the wet conditions made them tweak this a bit: “But we still encouraged the players to attack the space that our opponents gave us.”

“Our execution and intensity in the first 34 minutes were superb.”

Six minutes before half-time, his side was leading 19-3 against UP when the game was stopped due to impending lightning. It could have been a bad result if play had not continued, as 40 minutes was needed for a result.

“After the good start, we were quite anxious. We knew that we at least had to play until half-time to get a result.”

Outscoring opponents

It is their philosophy of playing without fear and scoring tries that has helped the Shimlas outscore other Varsity Cup teams.

The UFS scored 48 tries in eight rounds, with the University of Cape Town Ikeys second on 38 tries.

But the Kovsies are also solid on defence, as they have conceded only 21 tries. Only UP (20) conceded less.

There is, however, not too much talk in the Shimla camp about a semi-final yet.

“We are very happy with where we are on the log at the moment.

“We will continue working hard and playing good rugby. But we only focus on the next match,” says Tredoux.

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept