Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
06 April 2022 | Story Lacea Loader
NSFAS

The National Student Financial Aid Scheme (NSFAS) confirmed in a circular this week that monies will be paid to universities on 8 April 2022.

This will be the first payment that the University of the Free State (UFS) receives from NSFAS this year, as per the media statement by the Minister of Higher Education, Science and Innovation, Dr Blade Nzimande.

So far this year, the UFS management has made several concessions to students to alleviate their financial pressure while waiting for their NSFAS subsidies to be released.

This week, the university management – through active engagements and input from the Institutional Student Representative Council (ISRC) – agreed on the following process for book and meal allowances to be transferred to students’ bank accounts at the earliest possible opportunity:

  1. As in the past, the services of Fundi will be used to pay the allowances to students.
  2. Fundi will inform the recipients of monies received for them.
  3. After the banking details of students have been validated, monies are transferred to a student’s bank account. Fundi will inform students whose banking details are incorrect to rectify it on the Fundi website.
  4. Students who have not received payments before, will be requested to upload their banking details on the Fundi website, after which payment will be made.

It is anticipated that students whose bank accounts are with Standard Bank will receive notice of the payment of their allowance as soon as Friday, 8 April 2022.

Students banking with other banks will receive their payments subject to the inter-banking money transfer policies of the different banks, but not later than two business days after payment.

What students must do:

  1. Ensure that you upload the correct banking details.
  2. Upload your OWN banking details, not the banking details of friends or family.
  3. Ensure that your cellphone number is correct and active on PeopleSoft.
  4. Respond as quickly as possible to SMSes received from Fundi.

The university management would like to thank the majority of students for their patience during this difficult time while waiting for the NSFAS subsidies to be released.


Released by:
Lacea Loader (Director: Communication and Marketing)
Telephone: +27 51 401 2584 | +27 83 645 2454
Email: news@ufs.ac.za | loaderl@ufs.ac.za

News Archive

Physical Planning lives in recaptured space
2014-06-18

When the Department of Physical Planning decided on a new office premises, the team decided to tackle the project with an overarching theme – recycling.

It is important for Physical Planning to not only dictate to other departments on campus, but to set the example themselves,” says Nico Janse van Rensburg, Director: Physical Planning at the UFS. 

Recaptured space

New office space on campus is simply not available. It was therefore decided to recover space and a store room was identified. “Fortunately, the storage area had ceilings. However, it was dilapidated and was sagging all over. To divert attention from the ceiling, we painted it in a dark colour and the walls white.

“All wiring was also done superficially. It draws the attention away from the uneven surfaces and simplifies work on the wiring. Instead of trying to hide it, we made a focal point of it,” says Janse van Rensburg.

Recycled building materials

Lots of the building material that was used to convert the storage space into offices, was recovered from other building projects on campus. Material that would normally be discarded was utilised creatively to not only serve a practical purpose, but also an aesthetic one.

A laboratory basin was used as wash basin. Remaining parts of granite slabs from other sites were utilised as top for the basin. Existing toilets were also reused. To enhance the atmosphere, new taps in an affordable, but durable range were installed.

Recycled furniture

We rambled through every possible store room to find furniture. Tables were simply sanded and varnished and look better than new. Even the cabinet at the entrance was saved from wind and weather and reused.

Hot and smart

Only one screen wall was built. It was left in raw brick, unplastered and unpainted to contribute to contrasting textures. Existing walls were left painted or unpainted as it was before.

“The environment that was created breaks down several existing perceptions. Such as the perception that everything has to match; everything has to be plastered and painted and many others. This is an example of how different materials can be combined to create a lively environment.

“Staff members have already moved into their new offices and are very satisfied,” says Janse van Rensburg. 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept