Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
04 August 2022 | Story Jóhann Thormählen | Photo Supplied
Neil Powell
The former Kovsie Neil Powell, Blitzboks coach, steered the South African sevens rugby side to another Commonwealth Games gold medal in Birmingham, England.

Hard work does not necessarily guarantee success, but it is part of success.

According to Neil Powell, the Blitzboks head coach, this is what his players showed by turning the team’s recent misfortunes into Commonwealth Games gold.

The South African sevens side rewarded the University of the Free State (UFS) alumnus – who will be parting ways with the team next month – by claiming another Games top spot.

The decorated coach steered his troops to a gold medal in Birmingham, England, after defeating Fiji by an impressive 31-7 in the final late on Sunday evening.

Powell and the Blitzboks also won Commonwealth gold in Glasgow, Scotland, in 2014.

After nine successful years with the Blitzboks, the former Kovsie will become the new Director of Rugby at the Sharks in September 2022. His last sevens tournament will be the World Cup from 9 to 11 September 2022 in Cape Town.

Reset and rewarded

The Blitzboks, however, did not go into the Commonwealth Games as favourites, as they struggled in the last four HSBC World Rugby Sevens Series tournaments.

After winning the first four tournaments of the season, they failed to reach the semi-finals in Singapore, Vancouver, Toulouse, and London.

“After the World Series tournament in London, we had to reset and re-evaluate our goals for the rest of the season and the last three tournaments, the Commonwealth Games, the Los Angeles Sevens, and finally the Rugby World Cup Sevens,” Powell said in a SA Rugby media release.

“The guys really worked hard in the build-up to this tournament, and I’m glad they got rewarded for it.”

Memories from Glasgow Games

In 2016, Powell received a Cum Laude Award at the UFS Chancellor’s Distinguished Alumni Awards when the Blitzboks won Olympic bronze in Rio de Janeiro.

Powell represented the Cheetahs, Sharks, Griquas, Blue Bulls, and Blitzboks in his playing days and is one of 28 national sevens players produced by the UFS.

“It’s amazing to have won the gold medal again, like we did eight years ago in Glasgow, and especially after we finished fourth and didn’t win a medal at the previous Commonwealth Games in Australia, so there is a lot of emotion and the victory brought back memories of what happened in Glasgow in 2014.”

He said it was important for the team’s confidence to deliver in Birmingham in order to get momentum and belief back.

Powell hopes his side can take this into the last World Series tournament in Los Angeles on 27 and 28 August 2022, and the World Cup.

South Africa are on top of the World Series log and can take the overall honours with a good LA performance.

News Archive

UFS keeps the power on
2015-06-24

 

At a recent Emergency Power Indaba held on the Bloemfontein Campus, support structures at the university met to discuss the Business Continuity Intervention Plan to manage load shedding on the three campuses of the UFS.

Currently, 35 generators serving 55 of the buildings have already been installed as a back-up power supply on the three campuses of the university. According to Anton Calitz, Electrical Engineer at the UFS, the running cost to produce a kWh of electricity with a diesel generator amounts to approximately three times the cost at which the UFS buys electricity from Centlec.

Planned additional generators will attract in excess of R4 million in operating costs per year. For 2015, the UFS senior leadership approved R11 million, spread over the three campuses. Remaining requirements will be spread out over the next three years. University Estates is also looking at renewable energy sources.

On the Bloemfontein Campus, 26 generators serving forty-one buildings are in operation. On South Campus, two generators were installed at the new Education Building and at the ICT Server Room. Lecture halls, the Arena, the Administration Building, and the library will be added later in 2015. Eight generators serving 12 buildings are in operation on the Qwaqwa Campus. In 2015, the Humanities Building, Lecture Halls and the heat pump room will also be equipped with generators.

Most buildings will be supplied only with partial emergency power. In rare cases, entire buildings will be supplied because the cost of connecting is lower than re-wiring for partial demand. According to Nico Janse van Rensburg, Senior Director at University Estates, emergency power will be limited to lighting and power points only. No allowances will be made for air-conditioning.

“Most area lighting will also be connected to emergency power,” he said.

Where spare capacity is available on existing emergency power generators, requests received for additional connections will be added, where possible, within the guidelines. The following spaces will receive preference:
- Lecture halls with the lights, data projectors, and computers running
- Laboratories for practical academic work and sensitive research projects
- Academic research equipment that is sensitive to interruptions
- Buildings hosting regular events

According to Janse van Rensburg, all further needs will be investigated. Staff can forward all emergency power supply needs to Anton Calitz at calitzja@ufs.ac.za

Staff and students can also manage load shedding in the following ways:

1. Carry a small torch with you at all times, in case you are on a stairwell or other dark area when the lights go out. You can also use the flashlight app on your phone. Download it before any load shedding occurs. This can come in handy if the lights go out suddenly, and you cannot find a flashlight. Load-shedding after dark imposes even more pressure on our Campus Security staff. We can assist them with our vigilance and preparedness by carrying portable lights with us at all times and by assisting colleagues.
2. Candles pose a serious safety risk. Rather use battery- or solar-powered lights during load shedding.
3. Ensure that your vehicle always has fuel in the tank, because petrol stations cannot pump fuel during power outages.
4. Ensure that you have enough cash, because ATMs cannot operate without electricity.
5. The UFS Sasol Library has study venues available which students can use during load shedding.
6. When arranging events which are highly dependent on power supply, especially at night, organisers should consult the load-shedding schedule before determining dates and preferably also make back-up arrangements. If generators are a necessity, the financial impact should be taken into consideration.

The senior leadership also approved a list of buildings to be equipped with emergency power supplies.

More about load shedding at the UFS:
Getting out of the dark
More information, guidelines and contact information

 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept