Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
04 August 2022 | Story Jóhann Thormählen | Photo Supplied
Neil Powell
The former Kovsie Neil Powell, Blitzboks coach, steered the South African sevens rugby side to another Commonwealth Games gold medal in Birmingham, England.

Hard work does not necessarily guarantee success, but it is part of success.

According to Neil Powell, the Blitzboks head coach, this is what his players showed by turning the team’s recent misfortunes into Commonwealth Games gold.

The South African sevens side rewarded the University of the Free State (UFS) alumnus – who will be parting ways with the team next month – by claiming another Games top spot.

The decorated coach steered his troops to a gold medal in Birmingham, England, after defeating Fiji by an impressive 31-7 in the final late on Sunday evening.

Powell and the Blitzboks also won Commonwealth gold in Glasgow, Scotland, in 2014.

After nine successful years with the Blitzboks, the former Kovsie will become the new Director of Rugby at the Sharks in September 2022. His last sevens tournament will be the World Cup from 9 to 11 September 2022 in Cape Town.

Reset and rewarded

The Blitzboks, however, did not go into the Commonwealth Games as favourites, as they struggled in the last four HSBC World Rugby Sevens Series tournaments.

After winning the first four tournaments of the season, they failed to reach the semi-finals in Singapore, Vancouver, Toulouse, and London.

“After the World Series tournament in London, we had to reset and re-evaluate our goals for the rest of the season and the last three tournaments, the Commonwealth Games, the Los Angeles Sevens, and finally the Rugby World Cup Sevens,” Powell said in a SA Rugby media release.

“The guys really worked hard in the build-up to this tournament, and I’m glad they got rewarded for it.”

Memories from Glasgow Games

In 2016, Powell received a Cum Laude Award at the UFS Chancellor’s Distinguished Alumni Awards when the Blitzboks won Olympic bronze in Rio de Janeiro.

Powell represented the Cheetahs, Sharks, Griquas, Blue Bulls, and Blitzboks in his playing days and is one of 28 national sevens players produced by the UFS.

“It’s amazing to have won the gold medal again, like we did eight years ago in Glasgow, and especially after we finished fourth and didn’t win a medal at the previous Commonwealth Games in Australia, so there is a lot of emotion and the victory brought back memories of what happened in Glasgow in 2014.”

He said it was important for the team’s confidence to deliver in Birmingham in order to get momentum and belief back.

Powell hopes his side can take this into the last World Series tournament in Los Angeles on 27 and 28 August 2022, and the World Cup.

South Africa are on top of the World Series log and can take the overall honours with a good LA performance.

News Archive

UFS takes steps to address power shedding
2008-01-31

The problem of power shedding was urgently discussed by the Executive Committee of the Executive Management (Exco) during its meeting yesterday.

A report was presented by Ms Edma Pelzer, Director: Physical Resources and Special Projects, and a consulting electrical engineer about possible short, medium and long term solutions for the UFS.

This includes (a) the possible installation of equipment (eg. power generators) and (b) operating procedures to ensure the UFS’s functionality despite power shedding.

We are also in contact with Centlec to bring about the best possible arrangements for the UFS regarding the power shedding. It is possible that refined power shedding schedules will be implemented within a few weeks or a month to ensure that there is minimal disruptions at the UFS (especially during evening lectures).

In the long term it is unaffordable to generate power for the whole campus to meet everyone’s electricity needs. Only critical points will be supplied with emergency power generators.

Emergency power generation for certain critical points have already been provided for (eg. the Callie Human Centre, the evacuation of large halls, computer services, critical long term research projects, etc.). We have been doing surveys since 2006 to determine the UFS’s preparedness for “normal” power failures. The extent of the current situation has, however, taken the whole country by surprise.

Certain urgent steps were decided on yesterday. A decision was made to immediately design emergency power systems and supply it to the new examination centre and large lecture halls such as the Stabilis, Flippie Groenewoud, Agriculture building, and possibly the West Block. The delivery and installation of these systems will, however, take from three to six months.

The UFS will have to manage despite the power shedding, even after the emergency power systems have been installed and we will not be able to function as normal. Every division must devise operating procedures to deal with the power shedding without jeopardising the quality of core functions.

Bloemfontein is luckier than many other cities because Centlec is able (so far) to keep to the published schedule to a large extent.

Plans are also being made to keep staff and students continuously informed via the UFS web site about expected power shedding schedules and risks of power shedding in the course of a day.

Exco requests every faculty and support service to think about suitable operational solutions for managing their work and meetings during a power shedding.

Every line head has instructions to urgently determine the situation and needs in his or her division and indicate what practical arrangements can and must be made to schedule work around the power shedding. Every line head must provide Exco with a status report within a week.

In this way critical areas in terms of core functions and high quality service delivery will be determined and receive attention. Security systems and the safety of staff and students will also receive specific attention - this includes the residences.

In the mean time the Department of Physical Resources will carry on with a wide-ranging investigation into the extent of needs and plans and will compile a budget for the solution thereof.

Prof. Teuns Verschoor, Vice-Rector: Academic Operations, and the deans had a meeting yesterday to discuss problems and possible solutions around the power shedding in eg. computer rooms, during evening lectures, and practical classes.

Options may include eg. alternative time slots (eg. weekends) or alternative halls (eg. at the Vista Campus) for evening lectures which are affected by power shedding, or adjusted teaching methods.

Staff is requested not to install their own power generators under any circumstances. It can be very dangerous when such apparatus are linked to a building’s electrical system. The safety of staff and students and the risks of fire or injuries must also be the highest priority under all circumstances.

The Department of Physical Resources is also in the process of investigating options such as smaller power generators or ‘UPS’ apparatus as part of a broader evaluation of needs and potential solutions.

Exco wants to ensure all staff and students that this matter is receiving urgent attention and will keep on receiving it.

If there are any practical solutions about dealing with the power shedding (such as alternative ways of working) you are invited to send an e-mail to: lightsout@ufs.ac.za  

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept