Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
25 February 2022 | Story Lacea Loader

 

The Qwaqwa Campus of the University of the Free State (UFS) will reopen on 28 February 2022. The decision was made by the university management today after the campus was closed on 22 February 2022 due to violent protest action. 


From 28 February 2022 to 4 March 2022, all classes will be presented online. 

Students will be informed by their respective faculties about the model of academic delivery that will be followed from 7 March 2022. 

The arrangement is estimated to continue for two to three weeks at the most, after which the academic programme will return to the approved teaching plans for 2022.

Issued by:
Lacea Loader
Director: Communication and Marketing
University of the Free State
23 February 2022

News Archive

New residence planned for UFS South Campus
2015-05-14

The newly-planned residence
Illustration: Typology Architects

The South Campus of the University of the Free State (UFS) in Bloemfontein has seen a great influx of students in recent years. This campus provides academic access to the UFS for deserving matriculants who do not meet the requirements for entry into mainstream degree studies through the University Preparation Programme and Extended Degree Programmes.

In addition, it also offers studies to long-distance learners. The current number of contact students – those who physically attend class at the South Campus – stands at 1 673. At the moment these students stay either on the Bloemfontein Campus or in private accommodation. This is about to change as a new residence is being built for the South Campus.

The newly-planned residence will provide two hundred and fifty beds within two main blocks – each consisting of three floors. Since the campus is located in a predominately industrial area with very few housing facilities in the area, this will fill the urgent need for accommodation.

Each floor of the residence will consist of two wings with forty beds and twenty double rooms. In addition, each floor will have separate laundry/drying and cleaners’ facility shared by both wings on that floor. Each wing will have its own ablution block, study room, communal lounge, and kitchen.

Four separate single-room flats will also be available – each sharing a lounge, kitchen, and bathroom, with a laundry facility separate from that of the main blocks.

The building project is scheduled for completion by the end of June 2016.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept