Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
25 February 2022 | Story Anthony Mthembu | Photo Victor Ramphore Mahlohla (baddapictures)
Inaugural Dreamwalk 2022
The inaugural dream walk put students in high spirits for the rest of the year, as they were able to express and celebrate their dreams and aspirations.

The inaugural dream walk at the University of the Free State took place on the Bloemfontein Campus on 19 February 2022. The dream walk, also referred to as ‘Leeto la ditoro’, will become an annual event where first-year students come together to express and celebrate their dreams and aspirations. 

The event was well attended by Bloemfontein Campus first-year students, who believe that the event is a great way to set the tone for the rest of the year. The students first gathered at a station on campus, where they were issued with a faculty T-shirt, key chain, a dream card, and a mask. The official walk then began from the Visitor Centre Gate on the northwest side of the Bloemfontein Campus to the Main Building, where members of the senior leadership are based.
During the walk, first-year students had to write down their dreams and aspirations on the dream card, which they ultimately placed in a box at the Main Building. “I found it amazing to be able to put my dreams on paper; it makes them more realistic,” highlighted Marise Prinsloo, a first-year student from the Outeniqua residence. Although some of the aspirations were too personal for some first-year students to speak about, others’ aspirations varied from academic success, spiritual wellness, and mental and physical health. In fact, Malcolm Willemse, who is also a first-year student from Outeniqua, hopes to secure a number of leadership positions. “I have dreams of being in the first-year committee and of being in the sub-committees, and I managed to write these down,” he shared. 

In addition, the atmosphere at the event was vibrant, as the students were excited to engage with one another. “It was amazing to walk with other residences such as Villa Bravado, Abraham Fischer, and Conlaurês, as they have great spirit,’’ expressed Willemse. The walk included songs from the various residences, and the first-year students were dancing and singing along. However, the fun did not end there. Once the students arrived at the Main Building, they were treated to a DJ who had them dancing and singing even more.

As the dream walk event will also take place on the Qwaqwa and South Campuses, the students on these campuses can expect to take part in a lot of singing, dancing, and other cultural activities. Precious Modiba, who is also a first-year student, argues that besides having a good time, one of the best things about the dream walk is the friends that one gets to make.

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept