Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
27 January 2022 | Story Leonie Bolleurs | Photo Supplied
Director and co-producer Mpendulo Myeni believes when it comes to making it in the film industry, one should use all the resources and opportunities you have at your disposal.

A single, unemployed mother; institutional corruption, blackmail, and the powerful players behind it. These are all ingredients for a 29-minute short film, Leshano, currently available on Showmax. 

Mpendulo Myeni, director and co-producer of the production that was filmed between Bloemfontein and Bothshabelo last year, says he was initially attracted to the script by writer and executive producer, Anton Fisher (a former Director of Strategic Communications at the UFS). “Hearing his creative ideas, I fell deeper into the storyline, wanting to explore the story and tell it with my own voice.”

Besides Myeni’s involvement with Leshano (The Lie), which was filmed in Sesotho with English subtitles, a number of other Free State artists contributed to the film. Napo Masheane, who grew up in Qwaqwa, was cast in the lead role. He is supported by Maria de Koker, Vincent Tsoametsi, Seipati Mpotoane, Pesa Pheko, Ntsiki Ndzume, and Shayne Nketsi. 

Aspiring filmmakers in the province also had the opportunity to be part of this success story, whether as make-up artists, wardrobe assistants, or location scouts. 

Myeni says Bloemfontein artists and spectators are excited to see that a film shot locally has been accepted by the streaming service, Showmax. “The story has been welcomed and has had an overwhelming response on social media by the Free State audiences. Dignitaries in the Free State Provincial Department of Sports, Arts, Culture and Recreation also positively commented on social media.”

“The Free State audience has embraced our creative expression. Many have requested for the story to be turned into a series,” he says.

Creative at heart

Myeni, a creative at heart, studied Drama and Theatre Arts, as well as Film and Visual Media up to honours level at the UFS. He also had the opportunity to study as exchange student at the University of Groningen in their film master's programme.

The international experience ignited his passion for filming and got him fired up and ready to create. He was involved in the production of several films. “I co-wrote and directed Eyelash (2020), which won a jury award, iamAFRICA, at the Pan African Film Festival in Los Angeles. This led me to create the critically acclaimed lockdown film, called Let Me Out. This film was praised by notable film critic Robyn Sassen as ‘a coronavirus gem’, like Vincent Mantsoe’s dance piece, Cut … to materialise on the cultural sphere, and it deserves as much attention as it can garner.” Another recent creation from Myeni is Amanzi, a short film yet to be released. “I also directed The Lie and collaborated with amazing creatives during the venture,” he elaborates. 

The complete Eyelash experience, winning the iamAFRICA award at the Pan African Film Festival in Los Angeles, might have been one of those life-changing moments for Myeni. He confirms: “Going to America was definitely an out-of-this-world experience, especially being such a big accomplishment – winning an internationally recognised film award from a distinguished film festival. I also got to meet and talk to the director of YouTube originals, as well as other filmmaking creatives.”

Firm foundations

Besides being an UFS alumnus and award-winning filmmaker, Myeni, who on a previous occasion received the Richard Miles award in the Faculty of the Humanities, is now working as an assistant officer in the Department of Architecture at the UFS. “I largely work with research and the creative outputs of postgraduate students. Furthermore, I manage the research hub and library and I also run the visual media aspect within the department.”

In addition, Myeni is also completing his master’s degree in Film and Visual Media at the university. “The academia and higher learning are very important to me; you can say that I am motivated by the academic avenues and learning opportunities that my position affords me,” he says. 

He believes that any lived experience will give insight into your character and abilities. “This experience in the film industry will carry me through to give more of myself in my current position, both academically and creatively.”

“I will never stop creating; my future holds more films, with me involved in producing and directing them.” In five years’ time, I see myself having been the creator of at least three other short films, and one feature film,” concludes Myeni.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept