Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
28 January 2022 | Story Prof Sethulego Matebesi | Photo Sonia Small (Kaleidoscope Studios)
Prof Sethulego Matebesi
Prof Sethulego Matebesi.

Opinion article by Prof Sethulego Matebesi, Academic Head of Department, Associate Professor: Sociology, University of the Free State .


In Teams of Rivals, author Doris Goodwin notes how former American president Abraham Lincoln created value by surrounding himself with people who have the capacity and the tenacity to challenge him. Despite many of the challenges he faced throughout his presidency, he managed to build a common cause with his cabinet to foster the interests of Americans. In a completely different text, Crisis of Conscience: Whistleblowing in an Age of Fraud, Tom Mueller laments how people fail to act out of apathy, complicity, or fear. 


These two distinct texts raise the question of how leadership should react to criticism and the requisite degree of freedom of speech that public representatives should have. 


Similarly, the back-and-forth saga between Tourism Minister Lindiwe Sisulu and President Cyril Ramaphosa over whether she apologised for her opinion piece that criticised black judges, effectively drills home a longstanding historical lesson. This lesson is that political astuteness is a phenomenon as old as the history of politics itself.

Although the astuteness shown by Sisulu against critics from her political party may be puzzling, her public exchanges that a statement by President Cyril Ramaphosa was a ‘misrepresentation’ of their meeting are more puzzling. 
But why is this puzzling? What are we to do about what some call a show of unprecedented defiance and others assertiveness? We also need to ask whether Sisulu’s stance can be adequately explained by those who label her as being arrogant and who deserve to be fired by President Ramaphosa.

A political travesty to apologise on behalf of Sisulu

Public apologies are a common occurrence globally. They often come by way of assuming guilt, expressing remorse, and admitting responsibility. Thus, proper apology etiquette requires the ‘wrongdoer’ to deliver the apology. However, this was not the case with Minister Sisulu.

Sisulu acted in a very public way with her opinion piece and her response to the ‘apology in her name’ released by the presidency. Certainly, with her experience as a public figure, she was aware of the implications of her actions.

Furthermore, she was consistent with her narrative against criticism directed towards her. Yet, we do not know why the presidency saw the need to apologise on behalf of Sisulu. Perhaps it had unreasonable expectations that Sisulu would publicly accept what she disagreed with privately.

Notwithstanding the sincerity of the presidency in dealing with this matter, supporters of President Ramaphosa will, on the one hand, be disillusioned by this own goal. At the same time, those who support Minister Sisulu may be encouraged by her steadfast refusal to accept a coerced apology used as a shaming mechanism. She inadvertently represents a dynamic articulation of an alternative repertoire of contention within the ANC.

Lately, we have witnessed a surge of nationalism globally during the COVID-19 pandemic. The Economist referred to the narrative battle between China and the United States over the pandemic as a ‘new scold war’, threatening to tear the world apart. But, as this Sino-US relationship reminds us, what is at stake is less the tit-for-tat scold war between Sisulu and Ramaphosa that threatens to spiral out of control, than the subdued attempts to attain constituent support within the ANC.

Sisulu herself has never publicly indicated her availability to contest the presidency of the ANC at its next elective conference. By any measure, if she does have such aspirations, stepping forward and engaging politically is one thing, but open defiance of authority is another. Since there are no permanently privileged constituencies in political malaise created by regeneration projects such as the organisational renewal drive of the ANC, the struggle to articulate and establish the interests of those who are aggrieved within the party is an ongoing process.

But where does this leave President Ramaphosa?

Many commentators have noted that his long game is no longer effective. However, President Ramaphosa wants to upend the notion that robust debates within the structures of the ANC are not tolerated. He is wary of the propensity of ANC structures to support those who are victimised. And while the scold war is in full swing, others will join in trying to win the hearts and minds of ANC members.

Meanwhile, when failure to act decisively in the face of predictable situations facing the country, particularly during a crisis; we can then no longer talk about protecting the interests of South Africans.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 