Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
20 January 2022 | Story Ruan Bruwer | Photo Supplied
Keenan Carelse.

University of the Free State (UFS) Alumni may be based all around the world, but the United Kingdom (UK) Alumni Chapter aims to reconnect with all those members.

The UK Chapter is a hub of a developing UFS international programme. “We want to provide an opportunity for alumni to share their university experiences with wider audiences,” explains Carmenita Redcliffe Paul, Assistant Director: Alumni Relations and Business Development at the UFS.

Platform to celebrate successes

“The programme aims to provide a platform to alumni to celebrate their successes and provide a window to the landscape of the life and times of the university and the people who shaped it.”

“We also want to celebrate the diversity of our former students and the many touchpoints which unite them.”

Two key projects, Global Citizen and Voices from the Free State, came to life as a result of the collective collaboration of this chapter. The Global Citizen invites people in a series of “courageous conversations” to rethink their relationship with the world. Voices from the Free State is a series of personal podcast narratives by outstanding alumni wherein they reflect their experiences at the UFS. They tell their stories and explain how their university years shaped their future and paved the way to their respective successes.

Relevant association with the UFS

“Furthermore, they motivate why their ongoing association with the UFS is still relevant and important,” says Redcliffe Paul.

The UK Alumni Chapter is led by alumni Francois van Schalkwyk and Keenan Carelse and supported by Adrienne Hall.

Redcliffe Paul says Carelse and Van Schalkwyk have been instrumental in the Voices from the Free State initiative as they are strategically and operationally invested. They create and co-host the podcast series.

Van Schalkwyk is an entrepreneur and innovator consulting with clients globally. Carelse is employed in the healthcare sector in the UK.

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept