Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
26 July 2022 | Story Jóhann Thormählen | Photo Supplied
Robert Summers (left) and Caden Kakora
The University of the Free State duo of Robert Summers (left) and Caden Kakora have been playing badminton together since junior level. They are part of the South African badminton team at the Commonwealth Games.

“A reflection of the commitment and hard work by all stakeholders under challenging circumstances over the past few years.”

This is how Maryka Holtzhausen, Acting Director of KovsieSport, describes the journey of sportsmen and sportswomen from the University of the Free State (UFS) taking part in the Commonwealth Games.

She says the UFS is very proud of the current and former Kovsies who will be flying their national flag at the showpiece in Birmingham, England, from 28 July 2022 until 8 August 2022.

South Africa and Lesotho represented

A total of eleven athletes and coaches with UFS ties, featuring in seven different sporting codes, will be competing at the Games.

Ten of them will represent South Africa and are part of the 251 athletes included in the final squad, while one will participate in the colours of Lesotho.

Anneke Bosch (women’s T20 cricket), Shindré-Lee Simmons (women’s hockey), Khanyisa Chawane, Lefébre Rademan (netball), Neil Powell (rugby sevens coach), Yolandi Stander (discus; athletics), Jovan van Vuuren (long jump; athletics), Robert Summers, and Caden Kakora (badminton) are all in Team South Africa.

Simmons, Rademan, Stander, Summers, and Kakora are current students, while Bosch, Chawane, Powell, and Van Vuuren are former Kovsies. Simmons also recently represented South Africa at the FIH Women’s Hockey World Cup.

The UFS triple jumper Lerato Sechele, who is the secretary of the Lesotho Athletes Commission, will represent Lesotho.

The Kovsie first-year student Elmien Viljoen (karate) will in turn be in action for South Africa at the Commonwealth Karate Championships, which takes place in Birmingham from 7 to 8 September 2022.

Power of sport

A proud Holtzhausen says their achievements also bring a future responsibility.

“It creates a sense of pride within the UFS community, but also instils a new responsibility to continue to strive for excellence and create opportunities to increase the UFS contribution on the highest levels.”

According to the former Protea netball captain, who represented South Africa in three Commonwealth Games, the power of sport is clearly visible at such an event. Holtzhausen played for her country at the 2010 Games in Delhi, in 2014 in Glasgow, and in 2018 in the Gold Coast.

“The Commonwealth Games eliminate all kinds of boundaries in South Africa, even between sporting codes. 

“It brings Team South Africa together: athletes, team officials, supporters, and spectators unite in their love and passion for sport.”


News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept