Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
16 March 2022 | Story Leonie Bolleurs | Photo Leonie Bolleurs
Drone training
Khanyisile Khanyi, trainer at Alpha One Aviation, and Alinah Nomthandazo Bokopt from Free State News, at the drone awareness training presented on the UFS South Campus.

A mixed group of 20 young people attended a Digital Television Broadcasting training session on the South Campus of the University of the Free State (UFS). The excited group of students received their first practical on drone awareness. 

The UFS South Campus was the venue for this session, which formed part of a pilot project for drone awareness training. If the training curriculum is approved by the aviation accrediting body, the UFS Division of Social Responsibility Projects will collaborate with Sollywood South Africa to present a six-month course consisting of theory and practical sessions, including a focus on heritage and culture, converting from analogue to digital format, drone conferencing, creative writing, safety management, entrepreneurship, event management, and drone manufacturing. 

Promoting self-employment

Campus Principal, Dr Marinkie Madiope, is thrilled about the possibilities of this pilot development opportunity. “Not many people in South Africa manufacture drones,” she says.

The university will ensure that the training is fit for purpose and that the qualification is recognised. “With its focus on impact and visibility in 2022, the UFS will impact disadvantaged communities by equipping the unemployed youth with the necessary skills to create their own employment.”

The service providers will source funding from the MICTSETA (Media, Information and Communication Technologies Sector Education and Training Authority) to formalise the course content. 

Investment in scarce skills

Thandeka Mosholi, Head: Social Responsibility, Enterprise, and Community Engagement on the UFS South Campus, says this project will not only contribute to job creation, but it will also bridge the gap in areas where there is a shortage of skills, such as drone manufacturing. “The skills obtained through this project also align with the Fourth Industrial Revolution,” Mosholi adds. 

Dr Zama Qampi, Executive Producer at Sollywood South Africa, says the company will erect a warehouse in the Free State later this year, specifically for the drone project.


News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept