Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
28 November 2022 | Story Edzani Nephalela | Photo Edzani Nephalela
UFS Creative Clubs
Joleen Hamilton assists learners with their activities.

In an ever-changing, increasingly complicated world, the youth must be prepared to bring knowledge and skills to solve issues, make sense of information, and know how to acquire and analyse evidence to make judgements. Science, Technology, Engineering, and Mathematics (STEM) education encourages discussions and problem-solving among students, developing practical skills and an appreciation for collaborations. 

The Social Responsibility Projects department on the UFS South Campus is running a Creative Clubs programme that speaks to STEM education and collaboration.

Opening opportunities 

The primary goal of Creatives Clubs, a MerSETA-funded programme, is to open opportunities to develop problem-solving, critical thinking, and reasoning skills. One aspect Creative Clubs focuses on is identifying potential in the pupil and supporting them in participating in the Eskom Expo for Young Scientists. Learners participate in mathematics, science, and coding activities at the club.

According to Joleen Hamilton, the coordinator and founder of Creatives Clubs, they currently host top-achieving learners in maths from eight schools from Grades 8–12 in Bloemfontein. These schools are split into two groups, which meet at the South Campus on Tuesdays and Thursdays. “We need maths daily, since it stimulates the intellect and aids problem-solving. That’s why, no matter how complicated the sum looks, keep trying and do not give up,” Hamilton said at one of the maths sessions.

Enhancing critical thinking

Matheko Thamae, also a coordinator, mentioned that this programme significantly improves maths and science outcomes for high school learners. “With a dynamic world of innovation and the 4th Industrial Revolution (4IR), the club also assists learners with critical thinking and in solving their communities’ socio-economic issues,” Thamae said. 

“Attending these sessions assists me in thinking out of the box and realising that every problem has a solution. I will continue to attend the programme so that I can find solutions to unresolved problems,” Sechaba Ramakatsa, a Grade 9 learner from Lekhulong Secondary School, said. Ramakatsa, who enjoys assisting others, aspires to be a medical doctor so that people might have better healthcare experiences.

News Archive

Getting out of the dark
2015-04-28

Photo: Leonie Bolleurs

Since 2008, the University of the Free State has been busy with the planning and implementation of projects to reduce the impact of load shedding. To date,  the cost of these projects has run to R6 million. They have been done primarily to ensure that the academic programme does not suffer damage as a result of the increasing interruptions in the power supply that are continuing this year.

The university’s greatest concern has been the provision of emergency power to the lecture halls and laboratories.

Thus far, 35 generators are servicing 55 buildings on the three campuses of the UFS. This includes 26 generators on the Bloemfontein Campus, eight on the Qwaqwa Campus in the Eastern Free State, and one generator on the South Campus in Bloemfontein. The generators are already in service, and are maintained in working order.

Since 2010, the university has also ensured that all newly-built academic buildings are equipped with emergency power supplies.

On the South Campus in Bloemfontein, the new lecture-hall building and the computer laboratory are equipped with emergency power, while the installation of emergency generators in other buildings is under way. The majority of the buildings on the Qwaqwa Campus in the Eastern Free State are equipped with emergency power supplies.

In the meantime, the UFS management has approved a further R11 million for the installation of additional generators on the three campuses. A further R1.5 million has also been approved for the purchase of two mobile generators.

To extend the work already done, the main task will be the installation of more generators on the Bloemfontein Campus to ensure that lecture halls with emergency power will be available for the centrally-arranged timetables, and to ensure that more of the critical laboratories will be provided with emergency power.

There are still  some important buildings and halls on the Bloemfontein Campus that must be supplied with emergency power. However, it is a costly process and must be brought into operation gradually. The further implementation of emergency power depends on the delivery of equipment. The university is also investigating alternative solutions for power provisioning, including solar power.

Generators with spare capacity are optimally deployed to satisfy the lower needs of the campus, including the Odeion, the ANNEX at Microbiology, the Stabilis ANNEX, the Agriculture Building, the UV-Sasol library, and the Francois Retief Building.

In addition, the UFS  is busy on all campuses, coupling area lighting, including

street lights and pedestrian walkways, to existing generators. Procedures for the operation of mechanical equipment, such as entrance gates, lifts, and so on, are currently being dealt with on all campuses. Continuous power sources for certain ICT equipment will be installed on all campuses to protect it against power surges.

Staff and students can also equip themselves with the necessary knowledge to manage load shedding in their specific areas of work and study. It is always helpful to know who to contact. The following list with guidelines and contact numbers has been compiled to assist you:

1. In an emergency, call Protection Services. This line will continue to operate, regardless of whether the power is on or off.
2. Avoid using lifts just before planned load shedding. Some lifts have emergency power packs which will bring the lift to the nearest floor and open the doors. If you still get stuck in a lift during a power outage, use your cellphone to call Protection Services. While you're waiting, stay calm and be patient.
3. If the access control systems in your building stop working after load shedding, contact Protection Services.
4. The students and staff members who are most at risk during load shedding are those in wheelchairs or with other mobility limitations. As far as possible, plan ahead to avoid being stuck on a floor or in a room that is difficult to access when load shedding is imminent. Please contact Protection Services if you need assistance.
5. During a fire, alarms WILL go off. Alarms are not power driven, but battery driven. For assistance, contact Protection Services.
6. The main UFS Switchboard (Bloemfontein Campus +27(0)51 401 9111 and Qwaqwa Campus +27(0)58 718 5000) will continue to operate during load shedding.

Contact details of Protection Services:

  • Bloemfontein Campus: +27(0)51 401 2634/2911
  • Qwaqwa Campus: +27(0)58 508 5460/5175
  • South Campus: +27(0)51 5051217

Communication and Brand Management will make information available on the UFS web, Facebook page, Twitter, Blackboard and the intranet. Get the load shedding schedule from Eskom’s webpage (http://loadshedding.eskom.co.za/). The Bloemfontein Campus falls in group 4 and the South Campus falls in group 2 in Centlec’s load shedding schedule.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept