Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
18 November 2022 | Story Anthony Mthembu | Photo Supplied
Lerato Pitso
Lerato Pitso, who will represent Lesotho in the Miss Supranational competition in 2023.

Lerato Pitso, a Bachelor of Social Sciences student at the University of the Free State (UFS), has been selected to represent her home country of Lesotho in the prestigious Miss Supranational competition, which will be held in Poland in 2023. “I’m still nervous about the fact that I have been selected to represent my country in this competition. However, the selection means that I have a lot of people who actually believe in me,” Pitso stated.

Miss Supranational

Miss Supranational is an internationally recognised beauty pageant overseen by the World Beauty Association.This is the third time that a UFS student has participated in this international competition. Earlier this year Boitumelo Sehlotho, a Bachelor of Accounting student at the UFS, who was also named the Face of Lesotho in 2019, represented her country at the Miss Supranational pageant 2022.  Thato Mosehle, a graduate from the Faculty of Health Sciences, was runner-up in the Miss Supranational pageant held in Poland in 2021.

Pitso perceives the pageant as a platform to encourage young women to do more to change the world. She was selected to represent Lesotho in the competition based on the contributions she made in and around her community.

Community Engagement

Pitso’s community engagement includes participation in a digital inclusion campaign in Lesotho. “The campaign intended to involve accountable ministries in addressing technological issues to empower students with technological skills to be competent for the global environment. Pitso was also involved in the Meal in a Jar initiative, which was run by the Office for International Affairs at the UFS. Through this initiative, high school learners in the Grassland community in Bloemfontein were taught to recycle materials, and to produce new products which they could then sell for profit. “The project aimed to spark an entrepreneurial mindset,” said Pitso. In addition, she has also worked with the SHE-HIVE Association, a non-governmental organisation based in Maseru, Lesotho, which offers counselling and legal assistance to those who have been affected by gender-based violence. As such, Pitso asserts that she is the best to represent her nation based on the work she has put in.

Preparing for the Miss Supranational stage

Pitso said getting ready for a competition of this magnitude is a huge undertaking. “Preparation for the big stage includes rigorous training in which one learns to walk in a certain manner, and a commitment to the gym in order to be physically fit for the competition.” She also asserts that taking care of her mental health is a priority before walking on that stage.

It is also important to note that the last two winners of the competition are from Africa, and this serves as motivation for Pitso. “The fact that people who come from a similar society to me could attain the prize makes me believe in myself. It means that it’s also possible for me to put in the work and excel in the competition,” she said.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept