Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
18 August 2023 | Story Lunga Luthuli | Photo Francois van Vuuren
Bloemfontein Campus Solar Farm
The solar plant on the UFS’s Bloemfontein Campus, part of the university’s commitment to combatting loadshedding and embracing sustainable energy.

The University of the Free State (UFS) has installed solar plants across its three campuses.

The university says this is in response to the call for urgent solutions to loadshedding and the promotion of environmentally sustainable, cleaner, and renewable energy solutions.

Nicolaas Esterhuysen, Director of Engineering Services at UFS University Estates, said,

“The PV (photovoltaic) systems are grid-tied without storage to ensure maximum benefits and faster payback periods.”

Esterhuysen said the UFS has saved up to R32,5 million since the first solar plant was commissioned in 2017 to help the UFS reduce the impact of loadshedding and its carbon footprint and energy costs. “This will substantially increase this year with the commissioning of two large new ground-mounted solar plants on the Bloemfontein Campus,” he said.

“The microgrid installation on Qwaqwa Campus is one of the biggest solar diesel hybrid systems installed in South Africa. It allows us to keep the campus running despite excessive power interruptions.”

The UFS is currently embarking on research as part of the Grid-related Research Group (GRRP) under the Interdisciplinary Centre for Digital Futures (ICDF) to also help staff and students with understanding renewable energy and sustainability.

Esterhuysen said the plants are further evidence of the UFS’s commitment to renewable and energy saving solutions. “It is our flagship project, but our focus is also on energy saving initiatives – to ensure we are becoming more energy efficient and eliminate energy wastage. We have plans for expansion on all campuses. Some of the highlights are an off-grid solution for the new student centre at Qwaqwa Campus and to make South Campus a self-sustaining campus.”

The installed grid-tied system solar plants are operating without batteries on all three campuses, giving the university an optimal configuration between capital cost and payback period.


The energy generated at the solar plants:

Bloemfontein Campus – 3688 kWp

Qwaqwa Campus – 918 kWp

South Campus – 759 kWp

Paradys – 125 kWp

News Archive

UFS launches expansions to Biotechnology Building
2015-11-04

     

Biotechnology Building
Photo: Leonie Bolleurs

To support the strategic focus of the University of the Free State (UFS) on teaching and learning in the field of Biotechnology, the Department of Microbial, Biochemical, and Food Biotechnology introduced upgrades and additions to the value of R23 million to the existing Biotechnology Building on its Bloemfontein Campus. The funding was provided by the Department of Higher Education and Training.

The new section, together with renovations to the existing part of the Biotechnology Building, was opened on Thursday 29 October 2015.

The Department, consisting of three disciplines - Microbiology, Biochemistry, and Food Biotechnology - is extremely diverse. Two of the three disciplines – Microbiology and Biochemistry – are housed in the Biotechnology Building.

Additions and renovations to the Biotechnology Building include:
-    Four new research laboratories
-    Nine revamped research laboratories

      

At the launch of the Biotechnology Building were,
from the left: Nico Janse van Rensburg,
Senior Director: University Estates;
Maureen Khati, University Estates,
Prof Nicky Morgan, Vice Rector: Operations
and Ria Deysel, Director: Facilities Management.
Photo: Leonie Bolleurs

The work to the building will have dramatic effects on the quality, as well as the quantity, of postgraduate students. Given the national priority to deliver students, this is very important, particularly at the doctorate level.

Prof Koos Albertyn from the Department said these were the first renovations and expansions done to the building since 1 January 1990. “We welcome the extra space. Forty-six more postgraduate students can now be accommodated in the department,” he said.

Construction took place on the south-western corner of the existing building. Further developments to the building include:
-    Six new offices
-    A lecture hall for 70 students
-    Laboratories that can accommodate 56 postgraduate students

Prof Martie Smit, Academic Head of the Department, said: “This new and refurbished facility enables us to give our best. As academics, we are committed to doing our part in delivering high-quality education at both undergraduate and postgraduate levels to students envisaging a future in biotechnology.”

The James Charles du Preez Seminar Room was also opened at the event. The seminar room is dedicated to Prof Du Preez – who was Head of the Department from October 2002 until the end of 2014. He played a major role in raising funds for upgrading the Biotechnology Building, including the addition of a new wing.



We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept