31 January 2023 | Story Leonie Bolleurs | Photo Leonie Bolleurs
UFS unveiled new spectrograph
Assisting Prof Richard Gray with the installation of the spectrograph and the polarimeter were the Electronics and Instrumentation departments at both the UFS and the ASU. Left from the spectrograph, are from the left, front: Innes Basson, Head of the Department of Electronics and Instrumentation, Prof Pieter Meintjes, Senior Professor in the Department of Physics, Mark Jackson, Department of Electronics and Instrumentation, Hélène Szegedi, Lecturer in the Department of Physics, and Prof Richard Gray. At the right, from the spectrograph, front, are Natali Matchelt, master’s student, Izak van der Westhuizen, Lecturer in the Department of Physics; Barend Crous, Department of Electronics and Instrumentation; middle: Wian Smit, master’s student, Joleen Barnard, master’s student; back: Kobus Krüger, Department of Electronics and Instrumentation, Henri Roodt, Department of Electronics and Instrumentation; and Dr Hendrik van Heerden, Department of Physics.

The University of the Free State (UFS) is gearing up to be a leading academic institution in astronomical research. The institution successfully mounted a spectrograph with a polarimeter to the Boyden Observatory 1,5-m telescope that will provide scientists with visual access to both the Northern and Southern Hemispheres. 

The instrument, which can be accessed from Boyden, an astronomical research observatory and science education centre a few kilometres outside Bloemfontein, will allow researchers such as the Astrophysics Group at the UFS to do simultaneous polarimetry and spectroscopy of astronomical sources. This is vital for the research they are working on.

Mounting the spectrograph to the telescope and installing the polarimeter completed the upgrade of the 1,5-m telescope and is a leap forward for the astrophysics group at the UFS. The upgraded telescope with the spectropolarimeter, with a valued cost of R1.5 million, will also provide unique opportunities for collaborative research between the Astrophysics Groups at the UFS and researchers from the Appalachian State University (ASU). This adds greatly to the astrophysics research capacity at the university.
 
Prof Richard Gray, who 2019 started with the development of the astronomical spectrograph for the UFS Department of Physics, is a world-renowned expert in stellar spectroscopy, from the Department of Physics and Astronomy at ASU in North Carolina in the US. He was mainly responsible for the development and building of the instrument. 

Prof Pieter Meintjes, Senior Professor from the UFS Department of Physics, describes the moment that installation was completed as a feeling of enormous relief. “It took many hours of hard work, planning and testing to marry the 90-year 1,5-m telescope with the new sophisticated instrument,” he says. 

Adding value to graduate programme

Besides the development and installation of the spectrograph, Prof Gray also designed and built a polarimeter which can be integrated with the spectrograph. When placed inside the spectrograph, this piece of equipment transforms the spectrograph into a spectropolarimeter, giving it additional functionality. “This allows us, for example, to detect and analyse polarised light. It enables us to study the effect of magnetic fields in astronomical sources which introduce various polarisation signatures that can be detected with the polarimeter,” explains Prof Gray.

“I am fascinated by the polarimetric capabilities that we never had before. It is a great step forward,” remarks Prof Meintjes. 

“The Department of Electronics and Instrumentation at the UFS played an enormous role in the building of several components of the instrument that Prof Gray designed, as well as getting the 1.5-m telescope research ready so that the completed instrument could be mounted to the telescope”, says Prof Meintjes

He envisages that the research instrument will be ready for research purposes by March this year. Up till then researchers, graduates, and third-year students will have the opportunity to spend time on the spectrograph to familiarise themselves with it.

polarimeter
Prof Richard Gray posing with the polarimeter. With him is Prof Pieter Meintjes. (Photo: Leonie Bolleurs)


“Once installation is finalised, the UFS will be the only academic institution in South Africa with access to a 1.5-m telescope paired with a spectrograph. This gives us an edge in terms of our astrophysics programme and the training we provide our students. It also adds so much value to our graduate programme,” he says.

New instrument provides much flexibility

The spectrograph offers Prof Meintjes many possibilities for his research, and he is eager to put the instrument to use. To study binary systems as well as the jets of Active Galactic Nuclei (AGN), you need a spectrograph, preferably with polarimetric capabilities. It can also be applied to finding elements at the surface levels of stars so that their chemical composition can be determined.

“In the past, we needed to send our researchers to Sutherland and they were never guaranteed clear skies. Having this facility gives us so much flexibility,” he says.

 

Tsebo Matsoso and Siphephelo Ndlovu

Prof Brian van Soelen from the Department of Physics will be a key user of the spectrograph for his research. He is also playing an important role in terms of postgraduate training and research where the spectrograph is applied. 

Photo: Mart-Mari Duvenhage

  

 


The polarimeter converts the spectrograph to a spectropolarimeter. This instrument, which is mounted on a telescope (in the case of the UFS, it is mounted on the Boyden 1,5-m telescope) enables the user to detect whether radiation from  astronomical objects are polarised and to analyse the level of polarisation of the  light. Scientists can then, for instance, study the effect of magnetic fields in astronomical sources, which introduce various polarisation signatures (typically with a characteristic  level of polarisation).

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept