31 May 2023 | Story Prof Anthony Turton | Photo Supplied
Prof Anthony Turton
Prof Anthony Turton is a water expert from the Centre for Environmental Management at the University of the Free State.


Opinion article by Prof Anthony Turton, Centre for Environmental Management, University of the Free State.


This week, our national sewage crisis really began to bite. A media storm has erupted over the cholera outbreak in Hammanskraal, while some families are now grieving for their dead relatives. It is important that we start this story by remembering the dead, because they were breadwinners in families, all doing their best to survive the tribulations of our times. They died unnecessarily, the victims of the slow onset disaster I spoke of in 2008 at a conference titled ‘Science Real and Relevant’.

At that conference, reference was made to three water quality challenges that we, in the dwindling aquatic sciences community, were all too aware of, but unable to speak about. We noted trends that data sets were showing us, and we felt a growing sense of alarm about the consequences of the trajectories on the graphs. We noted that our systems were failing rapidly, with much of our hard infrastructure in the water sector approaching the end of its useful design life. We noted with alarm the loss of skills, as the ravages of purging took its toll on our science, engineering, and technology core.  We noted the loss of dilution capacity in all our rivers after the first National Water Resource Strategy (NWRS), mandated by the National Water Act (NWA), indicated that we had allocated 98% of all the water in all our rivers and dams, as far back as 2002. We noted the migration of plumes of uranium moving into the headwaters of both the Vaal and Crocodile Rivers, both tributaries of the Orange and Limpopo respectively, driven by uncontrolled decant of acid mine water, as the gold mining industry started to collapse.

From these sets of data, a simple conclusion was drawn – SA was heading for a slow onset disaster unless we could convince our political leadership that we need to do things differently.

Here are some facts in the wake of the cholera crisis.

Fact 1 – The South African economy ran out of water in 2002 when the NWRS revealed that we had already allocated 98% of all the water we have legally available in terms of the NWA. This means that we cannot convince investors to have confidence in our future. We face an investment drought as a direct result of this startling but irrefutable fact.

Fact 2 – We produce more than 5 billion litres of sewage daily, all of which is discharged into our rivers and dams, only about 10% of which is treated to a standard that makes it safe for direct human contact.

Fact 3 – The Green and Blue Drop Reporting System was suspended by Nomvula Mokonyane when the data was showing trends in the failure of our sewage treatment works. This is like a pilot in a commercial airliner switching off the radar screen because the information being revealed was becoming uncomfortable to the poorly trained, but rapidly promoted cockpit crew. This is the undeniable genesis of the deaths we are seeing today.

Fact 4 – Because of Facts 1 and 2 combined, our tsunami of sewage can no longer be diluted in our rivers. In fact, more than 60% of all our large dams are now eutrophic, with highly enriched water breeding toxic cyanobacteria, all thriving off the warming water and growing flow of nutrients from sewage. In simple truth, we have lost our dilution capacity, and our rivers have been turned into hazardous sewers breeding harmful pathogens, including the flesh-eating bacteria that cost RW Johnson his leg. This means that cholera is only one of the risks we are facing from raw sewage in our rivers. For example, Hepatitis A is a waterborne pathogen directly related to sewage-contaminated rivers, but this is being reported separately in our slow onset disaster, so the penny has yet to drop.

Fact 5 – The current Minister of Water and Sanitation, Mr Senzo Mchunu, was brave enough to reinstate the Green and Blue Drop Reporting System, which has now shown that more than 90% of our wastewater treatment works are dysfunctional. He is a brave man in so doing, and I want to publicly support him as he tries to rebuild the trust that was destroyed by a previous minister.

So, this is where we are today. People are dying as a direct consequence of decisions made by a former minister, who clearly failed in her custodial role. She must ultimately be held to account for her dereliction of duty and blatant betrayal of public trust. Just this week, a spokesperson for the Presidency noted that his office was unable to intervene in another crisis, because the cooperative governance clause in our constitution prevented one sphere of government from intervening in the activities of another sphere. We must challenge this constitutional weakness and seek clarification from the appropriate court. How can a constitutional clause be so irrational as to prevent one part of government from intervening in another to avert a catastrophe? How many more lives must be lost to the absurdity of legal protection for those in power, while their activities are clearly not in the best interest of society as a whole? Surely a constitutional democracy is about empowering the citizens by protecting them against the consequences of failed service delivery.

From the depths of despair in the families of those whose lives have been lost to an entirely preventable illness, let us find the strength to rally as one and shout out, ‘enough is enough’. Our noble constitution grants all citizens rights to a better life in an environment that is safe from harm. Let us restore that dream by demanding that our sewage flows be brought under control. Surely this is the basis of modern civilization, irrespective of political persuasion or ideological preference.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 