Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
24 April 2024 | Story Leonie Bolleurs | Photo Supplied
Eco-vehicles race
Join the UFS on 18 May 2024 from 10:00-13:00 at the Red Square Parking area for the seventh annual Kovsie ACT Eco-Vehicle Race. Come and support your favourite team to victory!

Kovsie ACT at the University of the Free State (UFS) proudly presents the seventh Kovsie Eco-Vehicle Race, set to take place at the Equitas Parking area on the Bloemfontein Campus.

According to Karen Scheepers, Assistant Director: Student Life, ten teams will be participating in this year’s race, featuring the three UFS campuses as well as the Central University of Technology. The event promise excitement like never before.

Scheepers says, besides an exciting race, spectators can look forward to a new track and viewing area. She invites the public, staff and students to come and support the competing teams as they showcase their skills on the racetrack.

Event details:

  • Date: Saturday 18 May 2024
  • Time: 10:00-13:00
  • Venue: Red Square Parking area (opposite George du Toit Building)

Breakdown of the programme:

09:00 -10:15 Performance by student artists 
10:15 -10:35 Walkthrough by judges
10:35 -10:40 Welcoming
10:40 Races commence
12:30 -13:00 Announcement of winners

13:00 -14:00 Performance by student artists

The Eco-Vehicle Race marks the culmination of a nine-month co-curricular skills programme, aimed at empowering participating students with a set of skills for the world of work. Through this programme, they are equipped with basic knowledge and abilities on sustainable energy, enabling them not only to compete in the eco-vehicle race but also to comprehend the inner workings of the vehicle. This understanding is important to the teams for when they are doing repairs during the race.

Students will be competing in three events:

• Obstacle course: Teams will be challenged by obstacles to test their control over the car.
• Smart lap: A timed lap in which the drivers take the main track for the first time.

• Endurance race: The teams need to finish as many laps as possible using the least amount of energy in 45 minutes.

The winners of the three events will each be awarded a trophy. Additionally, there will be a trophy for the best pit stop as well as a spirit cup for the team with the best energy and support from the audience.

For more information, contact Teddy Sibiya.

News Archive

UFS keeps the power on
2015-06-24

 

At a recent Emergency Power Indaba held on the Bloemfontein Campus, support structures at the university met to discuss the Business Continuity Intervention Plan to manage load shedding on the three campuses of the UFS.

Currently, 35 generators serving 55 of the buildings have already been installed as a back-up power supply on the three campuses of the university. According to Anton Calitz, Electrical Engineer at the UFS, the running cost to produce a kWh of electricity with a diesel generator amounts to approximately three times the cost at which the UFS buys electricity from Centlec.

Planned additional generators will attract in excess of R4 million in operating costs per year. For 2015, the UFS senior leadership approved R11 million, spread over the three campuses. Remaining requirements will be spread out over the next three years. University Estates is also looking at renewable energy sources.

On the Bloemfontein Campus, 26 generators serving forty-one buildings are in operation. On South Campus, two generators were installed at the new Education Building and at the ICT Server Room. Lecture halls, the Arena, the Administration Building, and the library will be added later in 2015. Eight generators serving 12 buildings are in operation on the Qwaqwa Campus. In 2015, the Humanities Building, Lecture Halls and the heat pump room will also be equipped with generators.

Most buildings will be supplied only with partial emergency power. In rare cases, entire buildings will be supplied because the cost of connecting is lower than re-wiring for partial demand. According to Nico Janse van Rensburg, Senior Director at University Estates, emergency power will be limited to lighting and power points only. No allowances will be made for air-conditioning.

“Most area lighting will also be connected to emergency power,” he said.

Where spare capacity is available on existing emergency power generators, requests received for additional connections will be added, where possible, within the guidelines. The following spaces will receive preference:
- Lecture halls with the lights, data projectors, and computers running
- Laboratories for practical academic work and sensitive research projects
- Academic research equipment that is sensitive to interruptions
- Buildings hosting regular events

According to Janse van Rensburg, all further needs will be investigated. Staff can forward all emergency power supply needs to Anton Calitz at calitzja@ufs.ac.za

Staff and students can also manage load shedding in the following ways:

1. Carry a small torch with you at all times, in case you are on a stairwell or other dark area when the lights go out. You can also use the flashlight app on your phone. Download it before any load shedding occurs. This can come in handy if the lights go out suddenly, and you cannot find a flashlight. Load-shedding after dark imposes even more pressure on our Campus Security staff. We can assist them with our vigilance and preparedness by carrying portable lights with us at all times and by assisting colleagues.
2. Candles pose a serious safety risk. Rather use battery- or solar-powered lights during load shedding.
3. Ensure that your vehicle always has fuel in the tank, because petrol stations cannot pump fuel during power outages.
4. Ensure that you have enough cash, because ATMs cannot operate without electricity.
5. The UFS Sasol Library has study venues available which students can use during load shedding.
6. When arranging events which are highly dependent on power supply, especially at night, organisers should consult the load-shedding schedule before determining dates and preferably also make back-up arrangements. If generators are a necessity, the financial impact should be taken into consideration.

The senior leadership also approved a list of buildings to be equipped with emergency power supplies.

More about load shedding at the UFS:
Getting out of the dark
More information, guidelines and contact information

 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept