Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
24 April 2024 | Story Leonie Bolleurs | Photo Supplied
Eco-vehicles race
Join the UFS on 18 May 2024 from 10:00-13:00 at the Red Square Parking area for the seventh annual Kovsie ACT Eco-Vehicle Race. Come and support your favourite team to victory!

Kovsie ACT at the University of the Free State (UFS) proudly presents the seventh Kovsie Eco-Vehicle Race, set to take place at the Equitas Parking area on the Bloemfontein Campus.

According to Karen Scheepers, Assistant Director: Student Life, ten teams will be participating in this year’s race, featuring the three UFS campuses as well as the Central University of Technology. The event promise excitement like never before.

Scheepers says, besides an exciting race, spectators can look forward to a new track and viewing area. She invites the public, staff and students to come and support the competing teams as they showcase their skills on the racetrack.

Event details:

  • Date: Saturday 18 May 2024
  • Time: 10:00-13:00
  • Venue: Red Square Parking area (opposite George du Toit Building)

Breakdown of the programme:

09:00 -10:15 Performance by student artists 
10:15 -10:35 Walkthrough by judges
10:35 -10:40 Welcoming
10:40 Races commence
12:30 -13:00 Announcement of winners

13:00 -14:00 Performance by student artists

The Eco-Vehicle Race marks the culmination of a nine-month co-curricular skills programme, aimed at empowering participating students with a set of skills for the world of work. Through this programme, they are equipped with basic knowledge and abilities on sustainable energy, enabling them not only to compete in the eco-vehicle race but also to comprehend the inner workings of the vehicle. This understanding is important to the teams for when they are doing repairs during the race.

Students will be competing in three events:

• Obstacle course: Teams will be challenged by obstacles to test their control over the car.
• Smart lap: A timed lap in which the drivers take the main track for the first time.

• Endurance race: The teams need to finish as many laps as possible using the least amount of energy in 45 minutes.

The winners of the three events will each be awarded a trophy. Additionally, there will be a trophy for the best pit stop as well as a spirit cup for the team with the best energy and support from the audience.

For more information, contact Teddy Sibiya.

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept