Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
05 December 2024 | Story Dr Cindé Greyling | Photo Kaleidoscope
MACE Winners 2024
From left to right: Burneline Kaars (Head: Employee Wellness and Organisational Development), Dr WP Wahl (Student Life Director), Linda Greyling (Senior Officer: Special Projects, Student Recruitment Services), Gerben Van Niekerk (Senior Officer: Kovsie Support Services), Malia Maranyane (Senior Officer: Undergraduate Marketing, Student Recruitment Services), Nomonde Mbadi (Student Recruitment Services Director), and Susan Van Jaarsveld (Senior Director: Human Resources).

On 28 November 2024, the University of the Free State (UFS) did it again – reigned as champions at the annual Marketing, Advancement and Communication in Education (MACE) Excellence Awards and walking away with two of the top awards: the MACE Award for Outstanding Research and the Severus Cerff Award for Consistent Excellence.

KovsieX was named the overall winner of the MACE Award for Outstanding Research. This award is made to the entry with the highest score in research, clearly demonstrating how research has supported the strategic objectives of the institution and the project. KovsieX is a multiplatform approach designed to leverage the strengths of diverse media channels. This digitalisation aligns with Vision 130, leveraging emerging technologies to enhance teaching and learning quality and efficiency of non-academic support structures and systems.

The UFS’ entries were of such high quality that the university won the sought-after Severus Cerff Award for Consistent Excellence. This award is based on the number of entries entered by an institution and the number and level of those entries winning awards. The award is therefore made to the institution with the highest success ratio.

Furthermore, the UFS Matriculant of the Year event received a Silver Award – entries scoring 5.75 or higher earn a Silver Award, placing this event among some of the top achievers in the events category. Three UFS entries received Gold Awards and were the winners in their respective categories: KovsieChat (Digital Channels), 2024 Women’s Day Breakfast (Events), and KovsieX (Stakeholder Engagement Campaigns). This is a magnificent achievement for the UFS.

"Winning a MACE award at this early stage is proof that KovsieX is not just meeting national standards – it’s setting them. If we can achieve this level of excellence now, imagine how we’ll compete on the global stage when the project is fully realised,” says Gerben van Niekerk, Student Media Manager.

Lacea Loader, Senior Director: Communication and Marketing and Coordinator of the MACE Excellence Awards, explained that a record number of entries were received for the Excellence Awards this year. “We are ecstatic about the direction of communication at the UFS and that the university has been able to maintain the quality of its entries in recent years,” says Loader.

The MACE Excellence Awards takes place annually as part of the MACE National Conference, recognising and celebrating excellence and the achievements of specialists and practitioners in marketing, advancement, and communication in the higher-education sector. This year, the Cape Peninsula University of Technology (CPUT) hosted the conference from 27 to 28 November 2024.

In 2023, the UFS won 11 awards, including the Chairperson’s Award of Excellence. 

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept