Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
16 January 2024 | Story Leonie Bolleurs
Scie-Ed building

The university is transforming its campus with state-of-the-art infrastructure development. We are creating spaces that foster learning, empower groundbreaking research, and offer an enriching university experience.

UFS Sasol Library

The UFS has been hard at work to move away from traditional library spaces towards creating tech-enhanced, flexible environments that are dynamic for teaching and learning. According to Jeannet Molopyane, Director of Library and Information Services, they strive to align their spaces with global best practices with the infrastructure changes.

Centre for Mineral Biogeochemistry

The Centre for Mineral Biogeochemistry – completed in February 2023 – integrates seamlessly with its surrounding environment, while also providing a new collaborative workspace for the centre’s personnel. This state-of-the-art facility boasts various laboratories which were mainly funded by the Department of Science and Innovation (DSI). The CMBG includes, among other initiatives, the Mineral Node of the Biogeochemistry Research Infrastructure Platform (BIOGRIP), an initiative of the DSI. This space is situated next to the existing Microbiology Building on the Bloemfontein Campus. 

University Estates Building

For this repair and renovation project, with a construction theme, internal and external materials were selected for their low-maintenance qualities. The first office, located opposite the entrance door, features cladding with exposed galvanised corrugated iron. A new steel mezzanine level was installed and painted in ‘CAT’ yellow and black. All pipes, including plumbing and electrical, are exposed on wall surfaces. The use of internal exposed brickwork, concrete floors, and oriented strand board in ceilings and cupboards further accents this quality in the completed project. 

Animal Research Centre

The Animal Research Centre on the Qwaqwa Campus, replaced the temporary structure that previously served as animal housing. The new structure complies with the requirements and standards for a research facility and caters to the needs of researchers and animals, including small and large rodents. The exterior materials used complement those of the surrounding buildings, providing a low-maintenance profile. The building, accessible to persons with disabilities, contains two research laboratories, an ecotoxicology laboratory, a veterinarian’s office, and a procedure room.

South Campus 24/7 Study Space

The shift to extended programmes and dramatic increase in student enrolment on the South Campus created the need for additional study areas. Considering the steep site outcrop and the existing pedestrian routes from the lower campus, the design explored building blocks that progressively staggered up the hill to accommodate a small amphitheatre study area, maximising seating capacity. This allows the building to accommodate the site’s steepness rather than ignore it. The final design provides study spaces on three levels, all accessible via a ramp, with the main functions situated on the primary level. This design also ensures accessibility for all users, including those with disabilities.

KovsieGear

Incline Architects has designed a new innovative space on the Thakaneng Bridge on the Bloemfontein Campus to accommodate the expansion of the KovsieGear outlet. This new design incorporates extra retail space along with additional room for administration work. The KovsieGear shop now features a new aesthetic, created with natural materials to complement the UFS colours.

News Archive

UFS staff get salary adjustment of 13,35%
2008-11-13

 

At the signing of the salary agreement were, from the left: Prof. Johan Grobbelaar, Chairperson of UVPERSU, Prof. Teuns Verschoor, Acting Rector of the UFS, and Ms Senovia Welman, Chairperson of NEHAWU.
Photo: Anita Lombard

UFS staff get salary adjustment of 13,35%

The University of the Free State’s (UFS) management and trade unions have agreed on an improvement in the service benefits of staff of 16,55% for 2009. This includes a general salary adjustment of 13,35% (according to the estimated government subsidy that will be received in 2009).

“The negotiating parties agreed that adjustments could vary from a minimum of 13,00%, or more, depending on the government subsidy and the model forecasts. If the minimum of 13,00% is not affordable, the parties will re-negotiate,” said Prof. Teuns Verschoor, Acting Rector of the UFS.

“The negotiations were conducted in a positive spirit and the parties are in agreement that it is an exceptionally good adjustment – being higher than for example the increase in medical premiums,” said Prof. Verschoor.

The agreement was signed yesterday by representatives of the UFS management and the trade unions, UVPERSU and NEHAWU.

An additional once-off non-pensionable bonus of R3 390 will also be paid to staff later this year.

The bonus will be paid to all staff members who were in the employ of the UFS on UFS conditions of service on 10 November 2008 and who assumed duties before 1 October 2008. This includes all former Vista staff, regardless of whether they have already been aligned with UFS conditions of service.


The bonus is payable in recognition of the role played by staff during the year to promote the UFS as a university of excellence and as confirmation of the role and effectiveness of the remuneration model.

“It is important to note that this bonus can be paid due to the favourable financial outcome of 2008,” said Prof. Verschoor.

It is the intention to pass the maximum benefit possible on to staff without exceeding the limits of financial sustainability of the institution. For this reason, the negotiating parties reaffirmed their commitment to the Multiple-year Income-related Remuneration Improvement Model used as a framework for negotiations. The model and its applications are unique and has as a point of departure that the UFS must be and remain financially sustainable.

Additional funding (0,70%) was also negotiated. This will be allocated on 1 January 2009 to accelerate the phasing-in of medical benefits and, if possible, to finalise the phasing-in process. Agreement was reached that 2,50% will be allocated for growth in capacity building to ensure that provision is made for the growth of the UFS over the last few years, as well as the incorporation of Vista staff.

The agreement also applies to all staff members of the two above-mentioned campuses whose conditions of employment have already been aligned with those of the Main Campus.

The implementation date for the salary adjustment is 1 January 2009. The adjustment will be calculated on the total remuneration package.

In 2008, a total improvement of service benefits of 9,32% and a salary adjustment of 7,52% were paid to employees. Staff received a once-off non-pensionable bonus of R3 000 at the end of 2007.

Media Release
Issued by: Lacea Loader
Assistant Director: Media Liaison
Tel: 051 401 2584
Cell: 083 645 2454
E-mail: loaderl.stg@ufs.ac.za  
12 November 2007
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept