Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
16 January 2024 | Story Leonie Bolleurs
Scie-Ed building

The university is transforming its campus with state-of-the-art infrastructure development. We are creating spaces that foster learning, empower groundbreaking research, and offer an enriching university experience.

UFS Sasol Library

The UFS has been hard at work to move away from traditional library spaces towards creating tech-enhanced, flexible environments that are dynamic for teaching and learning. According to Jeannet Molopyane, Director of Library and Information Services, they strive to align their spaces with global best practices with the infrastructure changes.

Centre for Mineral Biogeochemistry

The Centre for Mineral Biogeochemistry – completed in February 2023 – integrates seamlessly with its surrounding environment, while also providing a new collaborative workspace for the centre’s personnel. This state-of-the-art facility boasts various laboratories which were mainly funded by the Department of Science and Innovation (DSI). The CMBG includes, among other initiatives, the Mineral Node of the Biogeochemistry Research Infrastructure Platform (BIOGRIP), an initiative of the DSI. This space is situated next to the existing Microbiology Building on the Bloemfontein Campus. 

University Estates Building

For this repair and renovation project, with a construction theme, internal and external materials were selected for their low-maintenance qualities. The first office, located opposite the entrance door, features cladding with exposed galvanised corrugated iron. A new steel mezzanine level was installed and painted in ‘CAT’ yellow and black. All pipes, including plumbing and electrical, are exposed on wall surfaces. The use of internal exposed brickwork, concrete floors, and oriented strand board in ceilings and cupboards further accents this quality in the completed project. 

Animal Research Centre

The Animal Research Centre on the Qwaqwa Campus, replaced the temporary structure that previously served as animal housing. The new structure complies with the requirements and standards for a research facility and caters to the needs of researchers and animals, including small and large rodents. The exterior materials used complement those of the surrounding buildings, providing a low-maintenance profile. The building, accessible to persons with disabilities, contains two research laboratories, an ecotoxicology laboratory, a veterinarian’s office, and a procedure room.

South Campus 24/7 Study Space

The shift to extended programmes and dramatic increase in student enrolment on the South Campus created the need for additional study areas. Considering the steep site outcrop and the existing pedestrian routes from the lower campus, the design explored building blocks that progressively staggered up the hill to accommodate a small amphitheatre study area, maximising seating capacity. This allows the building to accommodate the site’s steepness rather than ignore it. The final design provides study spaces on three levels, all accessible via a ramp, with the main functions situated on the primary level. This design also ensures accessibility for all users, including those with disabilities.

KovsieGear

Incline Architects has designed a new innovative space on the Thakaneng Bridge on the Bloemfontein Campus to accommodate the expansion of the KovsieGear outlet. This new design incorporates extra retail space along with additional room for administration work. The KovsieGear shop now features a new aesthetic, created with natural materials to complement the UFS colours.

News Archive

UFS staff get salary increase of at least 7,25%
2007-11-20

 

During the signing of the UFS's salary agreement were, from the left: Mr Olehile Moeng (Chairperson of NEHAWU), Prof. Frederick Fourie (Rector and Vice-Chancellor of the UFS), and Prof. Johan Grobbelaar (Chairperson of UVPERSU and spokesperson of the Joint Union Forum).
 

UFS staff get salary increase of at least 7,25%

The University of the Free State’s (UFS) management and trade unions have agreed on an increase of 9,32% in the service benefits of staff for 2008. This includes a general minimum salary increase of 7,25%.

A once-off non-pensionable bonus of R3 000 will be paid in December 2007.

The agreement was signed today by representatives of the UFS management and the trade unions, UVPERSU and NEHAWU.

“As the state subsidy level is unfortunately not yet known, remuneration could vary several percentage points between a window of 7,25 and 8,39%,” said Prof. Frederick Fourie, Rector and Vice-Chancellor of the UFS.

Should the government subsidy be such that the increase falls outside the window of 8,39%, the parties will negotiate again.

The bonus will be paid to staff members who were employed by the UFS on UFS conditions of service on 14 November 2007 and who assumed duties before 1 October 2007.

The bonus is payable in December 2007 in recognition of the role played by staff during the year to promote the UFS as a university of excellence and as confirmation of the role and effectiveness of the remuneration model.

“It is important to note that this bonus can be paid due to the favourable financial outcome of 2007,” said Prof. Fourie.

“Our intention is to pass the maximum benefit possible on to staff without exceeding the limits of financial sustainability of the institution.  For this reason, the negotiating parties reaffirmed their commitment to the Multiple-year Income-related Remuneration Improvement Model used as a framework for negotiations.  The model and its applications are unique and has as a point of departure that the UFS must be and remain financially sustainable,” said Prof. Fourie and Prof. Johan Grobbelaar, Chairperson of UVPERSU and Spokesperson of the Joint Union Forum.

The agreement provides for the phasing in of fringe benefits of contract appointments for 2008.  This includes the implementation of a pension/provident fund, housing allowance and the medical fund allowance as from 1 January 2008 to staff who are appointed on a contract basis.

Agreement was also reached that 1,0% will be allocated for structural adjustments in order to partially address the backlog in respect of remuneration packages of other higher education institutions.  These adjustments will be made after further investigations during 2008. 

The post levels that have been earmarked for adjustment are academic staff (associate professor, professor and dean) as well as certain post levels in the support services.

An additional R500 000 will be allocated to accelerate the rate of phasing in the medical fund allowances. 

The implementation date for the salary adjustments is 1 January 2008, but could possibly be implemented only at a later stage due to logistical reasons.   The adjustment will be calculated on the remuneration package.

The agreement also applies to all staff members of the Vista and Qwaqwa Campuses whose conditions of employment have already been aligned with those of the Main Campus.

Prof. Grobbelaar said that salary negotiations were never easy, but the model is an important tool.  He said the Joint Union Forum illustrates that people from different groups can work together if they share the same commitment and goal.

In 2007, a total salary adjustment of 5,7% and a once-off non-pensionable bonus of R2 000 was paid to staff.

Media Release
Issued by: Lacea Loader
Assistant Director: Media Liaison  
Tel:  051 401 2584
Cell:  083 645 2454
E-mail:  loaderl.stg@ufs.ac.za
20 November 2007

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept