Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
16 January 2024 | Story Leonie Bolleurs
Scie-Ed building

The university is transforming its campus with state-of-the-art infrastructure development. We are creating spaces that foster learning, empower groundbreaking research, and offer an enriching university experience.

UFS Sasol Library

The UFS has been hard at work to move away from traditional library spaces towards creating tech-enhanced, flexible environments that are dynamic for teaching and learning. According to Jeannet Molopyane, Director of Library and Information Services, they strive to align their spaces with global best practices with the infrastructure changes.

Centre for Mineral Biogeochemistry

The Centre for Mineral Biogeochemistry – completed in February 2023 – integrates seamlessly with its surrounding environment, while also providing a new collaborative workspace for the centre’s personnel. This state-of-the-art facility boasts various laboratories which were mainly funded by the Department of Science and Innovation (DSI). The CMBG includes, among other initiatives, the Mineral Node of the Biogeochemistry Research Infrastructure Platform (BIOGRIP), an initiative of the DSI. This space is situated next to the existing Microbiology Building on the Bloemfontein Campus. 

University Estates Building

For this repair and renovation project, with a construction theme, internal and external materials were selected for their low-maintenance qualities. The first office, located opposite the entrance door, features cladding with exposed galvanised corrugated iron. A new steel mezzanine level was installed and painted in ‘CAT’ yellow and black. All pipes, including plumbing and electrical, are exposed on wall surfaces. The use of internal exposed brickwork, concrete floors, and oriented strand board in ceilings and cupboards further accents this quality in the completed project. 

Animal Research Centre

The Animal Research Centre on the Qwaqwa Campus, replaced the temporary structure that previously served as animal housing. The new structure complies with the requirements and standards for a research facility and caters to the needs of researchers and animals, including small and large rodents. The exterior materials used complement those of the surrounding buildings, providing a low-maintenance profile. The building, accessible to persons with disabilities, contains two research laboratories, an ecotoxicology laboratory, a veterinarian’s office, and a procedure room.

South Campus 24/7 Study Space

The shift to extended programmes and dramatic increase in student enrolment on the South Campus created the need for additional study areas. Considering the steep site outcrop and the existing pedestrian routes from the lower campus, the design explored building blocks that progressively staggered up the hill to accommodate a small amphitheatre study area, maximising seating capacity. This allows the building to accommodate the site’s steepness rather than ignore it. The final design provides study spaces on three levels, all accessible via a ramp, with the main functions situated on the primary level. This design also ensures accessibility for all users, including those with disabilities.

KovsieGear

Incline Architects has designed a new innovative space on the Thakaneng Bridge on the Bloemfontein Campus to accommodate the expansion of the KovsieGear outlet. This new design incorporates extra retail space along with additional room for administration work. The KovsieGear shop now features a new aesthetic, created with natural materials to complement the UFS colours.

News Archive

UFS takes steps to address power shedding
2008-01-31

The problem of power shedding was urgently discussed by the Executive Committee of the Executive Management (Exco) during its meeting yesterday.

A report was presented by Ms Edma Pelzer, Director: Physical Resources and Special Projects, and a consulting electrical engineer about possible short, medium and long term solutions for the UFS.

This includes (a) the possible installation of equipment (eg. power generators) and (b) operating procedures to ensure the UFS’s functionality despite power shedding.

We are also in contact with Centlec to bring about the best possible arrangements for the UFS regarding the power shedding. It is possible that refined power shedding schedules will be implemented within a few weeks or a month to ensure that there is minimal disruptions at the UFS (especially during evening lectures).

In the long term it is unaffordable to generate power for the whole campus to meet everyone’s electricity needs. Only critical points will be supplied with emergency power generators.

Emergency power generation for certain critical points have already been provided for (eg. the Callie Human Centre, the evacuation of large halls, computer services, critical long term research projects, etc.). We have been doing surveys since 2006 to determine the UFS’s preparedness for “normal” power failures. The extent of the current situation has, however, taken the whole country by surprise.

Certain urgent steps were decided on yesterday. A decision was made to immediately design emergency power systems and supply it to the new examination centre and large lecture halls such as the Stabilis, Flippie Groenewoud, Agriculture building, and possibly the West Block. The delivery and installation of these systems will, however, take from three to six months.

The UFS will have to manage despite the power shedding, even after the emergency power systems have been installed and we will not be able to function as normal. Every division must devise operating procedures to deal with the power shedding without jeopardising the quality of core functions.

Bloemfontein is luckier than many other cities because Centlec is able (so far) to keep to the published schedule to a large extent.

Plans are also being made to keep staff and students continuously informed via the UFS web site about expected power shedding schedules and risks of power shedding in the course of a day.

Exco requests every faculty and support service to think about suitable operational solutions for managing their work and meetings during a power shedding.

Every line head has instructions to urgently determine the situation and needs in his or her division and indicate what practical arrangements can and must be made to schedule work around the power shedding. Every line head must provide Exco with a status report within a week.

In this way critical areas in terms of core functions and high quality service delivery will be determined and receive attention. Security systems and the safety of staff and students will also receive specific attention - this includes the residences.

In the mean time the Department of Physical Resources will carry on with a wide-ranging investigation into the extent of needs and plans and will compile a budget for the solution thereof.

Prof. Teuns Verschoor, Vice-Rector: Academic Operations, and the deans had a meeting yesterday to discuss problems and possible solutions around the power shedding in eg. computer rooms, during evening lectures, and practical classes.

Options may include eg. alternative time slots (eg. weekends) or alternative halls (eg. at the Vista Campus) for evening lectures which are affected by power shedding, or adjusted teaching methods.

Staff is requested not to install their own power generators under any circumstances. It can be very dangerous when such apparatus are linked to a building’s electrical system. The safety of staff and students and the risks of fire or injuries must also be the highest priority under all circumstances.

The Department of Physical Resources is also in the process of investigating options such as smaller power generators or ‘UPS’ apparatus as part of a broader evaluation of needs and potential solutions.

Exco wants to ensure all staff and students that this matter is receiving urgent attention and will keep on receiving it.

If there are any practical solutions about dealing with the power shedding (such as alternative ways of working) you are invited to send an e-mail to: lightsout@ufs.ac.za  

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept