Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
16 January 2024 | Story Leonie Bolleurs
Scie-Ed building

The university is transforming its campus with state-of-the-art infrastructure development. We are creating spaces that foster learning, empower groundbreaking research, and offer an enriching university experience.

UFS Sasol Library

The UFS has been hard at work to move away from traditional library spaces towards creating tech-enhanced, flexible environments that are dynamic for teaching and learning. According to Jeannet Molopyane, Director of Library and Information Services, they strive to align their spaces with global best practices with the infrastructure changes.

Centre for Mineral Biogeochemistry

The Centre for Mineral Biogeochemistry – completed in February 2023 – integrates seamlessly with its surrounding environment, while also providing a new collaborative workspace for the centre’s personnel. This state-of-the-art facility boasts various laboratories which were mainly funded by the Department of Science and Innovation (DSI). The CMBG includes, among other initiatives, the Mineral Node of the Biogeochemistry Research Infrastructure Platform (BIOGRIP), an initiative of the DSI. This space is situated next to the existing Microbiology Building on the Bloemfontein Campus. 

University Estates Building

For this repair and renovation project, with a construction theme, internal and external materials were selected for their low-maintenance qualities. The first office, located opposite the entrance door, features cladding with exposed galvanised corrugated iron. A new steel mezzanine level was installed and painted in ‘CAT’ yellow and black. All pipes, including plumbing and electrical, are exposed on wall surfaces. The use of internal exposed brickwork, concrete floors, and oriented strand board in ceilings and cupboards further accents this quality in the completed project. 

Animal Research Centre

The Animal Research Centre on the Qwaqwa Campus, replaced the temporary structure that previously served as animal housing. The new structure complies with the requirements and standards for a research facility and caters to the needs of researchers and animals, including small and large rodents. The exterior materials used complement those of the surrounding buildings, providing a low-maintenance profile. The building, accessible to persons with disabilities, contains two research laboratories, an ecotoxicology laboratory, a veterinarian’s office, and a procedure room.

South Campus 24/7 Study Space

The shift to extended programmes and dramatic increase in student enrolment on the South Campus created the need for additional study areas. Considering the steep site outcrop and the existing pedestrian routes from the lower campus, the design explored building blocks that progressively staggered up the hill to accommodate a small amphitheatre study area, maximising seating capacity. This allows the building to accommodate the site’s steepness rather than ignore it. The final design provides study spaces on three levels, all accessible via a ramp, with the main functions situated on the primary level. This design also ensures accessibility for all users, including those with disabilities.

KovsieGear

Incline Architects has designed a new innovative space on the Thakaneng Bridge on the Bloemfontein Campus to accommodate the expansion of the KovsieGear outlet. This new design incorporates extra retail space along with additional room for administration work. The KovsieGear shop now features a new aesthetic, created with natural materials to complement the UFS colours.

News Archive

UFS has a contingency plan for load shedding
2008-02-13


The University of the Free State (UFS) has put in place a contingency plan to ensure that there is minimal disruption to the normal academic operations of its Main Campus in Bloemfontein whenever load shedding occurs.

The plan includes alternative arrangements for certain lectures that fall within the load-shedding schedule provided by Centlec, the emergency power generation for certain lecture halls and buildings, as well as the functioning of the UFS Sasol Library. This is in addition to emergency power equipment that has already been ordered for the larger lecture-hall complexes.

Fortunately, the Qwaqwa Campus has adequate emergency power generation capacity. The situation on the Vista Campus in Bloemfontein is being monitored, but the same guidelines will apply as on the Main Campus.

On the Main Campus in Bloemfontein the following alternative arrangements regarding the timetable for evening classes will come into effect when load shedding occurs:

  • An alternative module and venue timetable has been compiled so that classes that cannot take place on weekdays as a result of load shedding can be accommodated on Fridays and Saturdays.
  • Classes that are presented in the timeslot 18:10 to 21:00 on Thursdays are alternatively accommodated in the same venues at the same times on a Friday.
  • Classes that take place in the timeslot 20:10 to 22:00 on Wednesdays are alternatively accommodated in the timeslot 08:10 to 12:00 on Saturdays, in a few cases in different venues from those scheduled initially.
  • After consultation with students, lecturers will decide whether the alternative timetable will apply when load shedding does indeed occur or whether the alternative timetable will be a permanent arrangement.

Some other steps that have been taken regarding the functioning of lecture halls include:

  • The design and installation of emergency power equipment in all the large lecture-hall complexes within the next few months. This includes the Examination Centre, Flippie Groenewoud Building, the Stabilis and Genmin lecture halls.
  • The ordering of a larger generator for the Agriculture Building to simultaneously provide essential research equipment such as refrigerators, ovens and glasshouses with emergency power.
  • An investigation into the optimal utilisation of present emergency power installations.
    The purchasing of loose standing equipment such as battery lights, uninterruptible power supplies, loose-standing generators, etc.

The UFS Sasol Library will continue as normal as far as possible though there may be some minor changes as a result of load shedding. The library has an emergency generator that will be used in the event of load shedding to allow students and other users to exit the library. If load shedding occurs during daylight hours, the library will remain open with limited services. If the load shedding occurs after 6 pm (18:00), all users will be allowed to exit and the library will remain closed until the next day.

A comprehensive investigation into the university’s preparedness for and management of long term power interruptions is also receiving attention.

More information on the contingency plan for load shedding can be obtained from the UFS website at www.ufs.ac.za/loadshedding.

Media Release
Issued by: Lacea Loader
Assistant Director: Media Liaison
Tel: 051 401 2584
Cell: 083 645 2454
E-mail: loaderl.stg@ufs.ac.za
13 February 2008


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept