Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
19 July 2024 | Story Lunga Luthuli | Photo Sonja Dlamini and Nokuthula Tshabalala
Kovsie Model United Nations 2024
Delegates at the 2024 Kovsies Model United Nations Summit engage in UN simulations, fostering international understanding and innovative problem-solving at the University of the Free State.

The University of the Free State (UFS) recently hosted the third annual Kovsies Model United Nations (KMUN) Summit, attracting delegates from universities and TVET colleges across South Africa.

This year's event, themed 'Building Sustainable Bridges for the World We Want', took place from 12 to 14 July 2024 and offered students the chance to engage in United Nations (UN) simulations to develop a deeper understanding of international affairs and innovative problem-solving. These UN simulations included the General Assembly, the Economic and Social Council, the Security Council, the UN Human Rights Council, and UNESCO.

Unique African solutions

The summit's keynote address was delivered by Deputy Minister of Higher Education and Training Buti Manamela. He stressed the importance of addressing global challenges in an African context, highlighting the role of youth in achieving the Sustainable Development Goals (SDGs), and why education lies at the heart of making this possible.

Manamela noted that the African Union (AU) had declared 2024 ‘The Year of Education’, emphasising the need for resilient and education systems that equip African youth with skills and knowledge for the modern world.

"Our problems in Africa are not different from the rest of the world; however, the solutions that are required must respond to the material conditions and the historical realities of our continent," he said.

Localise development goals

Dibolelo Mance, Free State MEC for Public Works and Infrastructure, also addressed the summit, urging youth to use the SDGs as an impetus to enhance their own communities and participate in global movements.

She highlighted local initiatives aimed at empowering young people to take active roles in their communities, using the SDGs as a development framework.

Policy partnership key for change

Dr Kevin Naidoo, Deputy Director-General of Policy, Governance, and Administration in the Department of Cooperative Governance and Traditional Affairs, stressed the role of youth as policy partners in implementing the UN SDGs and the AU’s Agenda 2063. He encouraged delegates to inspire change and actively participate in policymaking processes, advocating for a more inclusive and participatory approach to governance.

The KMUN Summit gave young leaders a platform to engage in meaningful discussions and develop critical skills. The event reaffirmed the importance of youth leadership in global affairs, highlighting their crucial role in shaping a better future.

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept