Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
13 June 2024 | Story Martinette Brits | Photo Supplied
Arran Wood pictured with Prof Jan Smith
Arran Wood pictured with Prof Jan Smith, Senior Lecturer at the Department of Architecture, in front of his project.

A former Master’s student in Architecture at the University of the Free State (UFS) has recently been honoured with the esteemed Corobrik National Student Architecture Award. The 2023 grand prize was awarded to Arran Wood from UFS for his project "Spectral Flesh – Remembrance," which explores South Africa's forgotten nuclear history.

Corobrik’s vision for this competition is to provide up-and-coming architecture students a platform to showcase their architectural talent and creativity. The eight finalists were chosen by major South African universities, each selecting its best Master’s architectural student to participate in the awards.

The eight regional finalists had the opportunity to present their theses to an esteemed panel of judges, including Carin Smuts from CS Studio Architects, Somers Govender from Artek 4 Architects and Rudolf Roos from HDG Pretoria.

Unveiling forgotten conflict: Architecture as a mediator and reminder

Wood’s project delves into the role architecture can play as a mediator and reminder of forgotten conflicts. “The Angola-South African War left extensive scars and remains a raw place in the lives of many South Africans. Yet the memory and memorialisation of the conflict have become a shrouded spectre. One of the most obscured fallouts of the war was the fact that South Africa managed to construct nuclear weapons and became the first nation to decommission their nuclear arsenal voluntarily,” Wood explained.

The thesis proposes a theoretical foundry and “inverted monument” at the forgotten nuclear weapons development site at Pelindaba near Hartbeesport Dam. He chose this project due to his interest in the relationship between architecture and memory, particularly the memory of warfare. “I wanted to focus my research on something specific to South Africa. I settled on the Angola-South African War because its fallout is still a relevant struggle that many people deal with, yet it remains largely unspoken. This led me to discover how intimately the nuclear weapons programme was connected to the conflict,” Wood stated. 

Awards pave the way to success

Wood mentioned that he had known about the prestigious Corobrik Awards early in his studies but only realised later that one winner is chosen to represent the whole country. “Winning the national award still feels a bit unreal. From prior experience, I have seen how the award's prestige follows the winners long into their careers, standing as a significant achievement. It is a great honour to be considered one of these winners, and I am very grateful for the lasting recognition the award brings to my career.”

He credited the lecturers and staff at the Department of Architecture for their significant role in his success. “They taught me what I know, and it was most inspiring to see their passion for architecture. The support from the lecturers at this incredible department goes far beyond their job descriptions,” he remarked.

Wood also won the Dean’s Medal for the best results in the final-year Master’s class during the April graduation ceremonies of UFS. He is currently working for an architectural firm in Cape Town, named TwoFiveFive Architects

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept