Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
18 November 2024 | Story Jacques Maritz | Photo Supplied
Muhammad Cassim
Muhammad Cassim, a second-year student in the Department of Engineering Sciences in the Faculty of Natural and Agricultural Sciences.

Muhammad Cassim, a second-year student in the Department of Engineering Sciences in the Faculty of Natural and Agricultural Sciences at the University of the Free State, will participate in the winter university project in Pskov, Russia, from 25 November to 9 December 2024.

The winter school aims to strengthen relationships among young engineers and deepen international interaction via skills improvement, joint projects, and social cohesion. The programme boasts a densely packed education block, project block, and cultural block.

Cassim is part of the UFS Grid Related Research Group and actively participates in research centred on complexity science. He intends to complete his BSc Physics degree with Engineering subjects and progress towards postgraduate studies in the UFS Department of Physics.

He is currently working on verifying experimental developments in the field of synchronisation in complex networks. While he has already completed this high-performance computing training in his first year under the leadership of Albert van Eck (Director, UFS E-research), he is looking forward to the masterclasses in holographic modelling, deep learning, direct laser deposition, and database. Closely resembling his current research, he will have the opportunity to gain more experience in the use of set theory and graph theory in solving digital information processing problems.

For more information about international scholarships for study abroad opportunities, contact Mbali Moiketsi in the Office for International Affairs.

Cassim’s student profile is the culmination of the department’s strategy to produce young applied scientists who are subjected to the culture of research during their undergraduate study and could articulate with ease to other departments for postgraduate studies.  The department aims to align with the UFS’ Vision 130 by producing competitive students who can operate in the postgraduate paradigm with the digital themes of veterinary science and ecological engineering science.  

News Archive

UFS takes steps to address power shedding
2008-01-31

The problem of power shedding was urgently discussed by the Executive Committee of the Executive Management (Exco) during its meeting yesterday.

A report was presented by Ms Edma Pelzer, Director: Physical Resources and Special Projects, and a consulting electrical engineer about possible short, medium and long term solutions for the UFS.

This includes (a) the possible installation of equipment (eg. power generators) and (b) operating procedures to ensure the UFS’s functionality despite power shedding.

We are also in contact with Centlec to bring about the best possible arrangements for the UFS regarding the power shedding. It is possible that refined power shedding schedules will be implemented within a few weeks or a month to ensure that there is minimal disruptions at the UFS (especially during evening lectures).

In the long term it is unaffordable to generate power for the whole campus to meet everyone’s electricity needs. Only critical points will be supplied with emergency power generators.

Emergency power generation for certain critical points have already been provided for (eg. the Callie Human Centre, the evacuation of large halls, computer services, critical long term research projects, etc.). We have been doing surveys since 2006 to determine the UFS’s preparedness for “normal” power failures. The extent of the current situation has, however, taken the whole country by surprise.

Certain urgent steps were decided on yesterday. A decision was made to immediately design emergency power systems and supply it to the new examination centre and large lecture halls such as the Stabilis, Flippie Groenewoud, Agriculture building, and possibly the West Block. The delivery and installation of these systems will, however, take from three to six months.

The UFS will have to manage despite the power shedding, even after the emergency power systems have been installed and we will not be able to function as normal. Every division must devise operating procedures to deal with the power shedding without jeopardising the quality of core functions.

Bloemfontein is luckier than many other cities because Centlec is able (so far) to keep to the published schedule to a large extent.

Plans are also being made to keep staff and students continuously informed via the UFS web site about expected power shedding schedules and risks of power shedding in the course of a day.

Exco requests every faculty and support service to think about suitable operational solutions for managing their work and meetings during a power shedding.

Every line head has instructions to urgently determine the situation and needs in his or her division and indicate what practical arrangements can and must be made to schedule work around the power shedding. Every line head must provide Exco with a status report within a week.

In this way critical areas in terms of core functions and high quality service delivery will be determined and receive attention. Security systems and the safety of staff and students will also receive specific attention - this includes the residences.

In the mean time the Department of Physical Resources will carry on with a wide-ranging investigation into the extent of needs and plans and will compile a budget for the solution thereof.

Prof. Teuns Verschoor, Vice-Rector: Academic Operations, and the deans had a meeting yesterday to discuss problems and possible solutions around the power shedding in eg. computer rooms, during evening lectures, and practical classes.

Options may include eg. alternative time slots (eg. weekends) or alternative halls (eg. at the Vista Campus) for evening lectures which are affected by power shedding, or adjusted teaching methods.

Staff is requested not to install their own power generators under any circumstances. It can be very dangerous when such apparatus are linked to a building’s electrical system. The safety of staff and students and the risks of fire or injuries must also be the highest priority under all circumstances.

The Department of Physical Resources is also in the process of investigating options such as smaller power generators or ‘UPS’ apparatus as part of a broader evaluation of needs and potential solutions.

Exco wants to ensure all staff and students that this matter is receiving urgent attention and will keep on receiving it.

If there are any practical solutions about dealing with the power shedding (such as alternative ways of working) you are invited to send an e-mail to: lightsout@ufs.ac.za  

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept