Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
29 October 2024 | Story Jacky Tshokwe | Photo Supplied
RAiN Automate Innovate Challenge 2024
The University of the Free State accounting students rise to the challenge in the RAiN Automate to Innovate Challenge.

The School of Accountancy at the University of the Free State (UFS) is leading a forward-thinking initiative by introducing the RAiN Automate to Innovate Challenge in 2024. This marks the first time that the UFS has run this challenge, and it is already making waves in the accounting education landscape. As one the few Accountancy department in South Africa to host such an event, the UFS is paving the way for technological integration in the academic world, setting the stage for future inter-university competitions.

The RAiN Automate to Innovate Challenge invited second-year BAcc students enrolled in the EIDE2724 module to participate in groups of three to four. Their task was to identify and solve a real-world problem related to either students or business by developing a robotic process automation (RPA) bot using Power Automate.

The challenge followed an exploratory learning approach, empowering students to dive into the world of automation with minimal formal lecturing. This approach develops students’ creativity and problem-solving skills. The students worked hard to master Power Automate and applied their knowledge to build automation bots that successfully solved business and student life problems.

Presentations and the final showdown

After presenting their bots on 10, 11, and 14 October, the top six groups were announced in class, eagerly awaiting the grand finale. The final round took place on 18 October from 12:00 to 14:00, where the top six groups competed head-to-head.

A distinguished panel of judges, consisting of three judges from RAiN Auditors and three from the UFS, evaluated the bots based on creativity, functionality, and potential impact. By the end of the event, the winning groups were announced, and the following prizes were awarded:

  • First place: R1 500 each
  • Second place: R1 200 each
  • Third place: R1 000 each

The prizes were generously sponsored by RAiN Auditors, showcasing their commitment to fostering innovation in education.

Looking ahead

As the first South African university to run this type of challenge, the UFS aims to inspire other institutions across the country to follow suit. The School of Accountancy is eager to expand this competition, with the hope of challenging other universities in 2025 and beyond, creating a platform for students to showcase their technical skills and business acumen in the rapidly evolving field of accounting.

Stay tuned for the impact and future growth of the RAiN Automate to Innovate Challenge, where we continue to push boundaries and prepare the next generation of accountants to excel in a digital world.

For more insight into the competition, check out the video recap [here](insert Vimeo link). Be sure to explore the image gallery, showcasing the incredible work and teamwork of our students.

Check out the video here for more details.

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept