Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
04 September 2024 | Story Leonie Bolleurs | Photo Stephen Collett
Prof Jeremy Smith
Prof Jeremy Smith, Adjunct Professor in the Department of Architecture, recently delivered his inaugural lecture on the UFS Bloemfontein Campus.

A few days after the annual Sophia Gray lecture, the Department of Architecture at the University of the Free State (UFS) hosted the inaugural lecture of Prof Jeremy Smith.

Prof Smith, the Design Director of Irving Smith Architects in New Zealand and an Adjunct Professor in the UFS Department of Architecture, is known for his innovative approach to architecture that emphasises sustainability and the relationship between buildings and their natural surroundings.

Earlier this year, he partnered with RTA Studio – an architectural firm based in Auckland, New Zealand – and won the prestigious Dubai International Best Practices Award for Sustainable Development in the category of the Most Beautiful, Innovative and Iconic Building with the entry: The ‘Scion Innovation Hub, Te Whare Nui O Tuteata.

A changing climate

Themed Being Finished is Finished, the lecture attracted a diverse audience of architects, industry stakeholders, academics, students, and the general public. Prof Vasu Reddy, Deputy Vice-Chancellor: Research and Internationalisation, welcomed Prof Smith and the attendees. He congratulated Prof Smith on this milestone, highlighting that a professor’s work often represents the beginning of much unfinished business. He noted that the UFS is proud to host such lectures, which celebrate and acknowledge excellence in research and practice.

Prof Paul Oberholster, Dean of the Faculty of Natural and Agricultural Sciences, introduced Prof Smith, praising his impressive career and the numerous national and international awards he has received.

Prof Smith’s lecture focused on the evolving relationship between architecture and the landscape, particularly in New Zealand, where only a quarter of the original forests remain. “We know our climate is changing. In New Zealand we massively made landscape; landscape is everything. Modernism has asked us to use the lawnmower,” he remarked.

He believes in the importance of architecture that adapts and evolves within its natural surroundings, rather than imposing new landscapes. He introduced the concept of ‘soft architecture’, which involves designing buildings that fit into the changing landscape. This approach allows for a sustainable relationship between architecture and nature, ensuring that buildings enhance rather than dominate their environment.

He illustrated this philosophy with a project, the ‘Bach with Two Roofs’ house, which was damaged by a cyclone in 2014. The storm altered the surrounding landscape, and rather than simply repairing the house, Prof Smith redesigned it in a flexible and adaptive manner that might accommodate environmental change. This project demonstrated how buildings can be refurnished to adapt to a shift in the landscape, ultimately coexisting with and responding to the natural world.

“From life in the forest, the landscape shifted – the sun was hotter, the wind was stronger. Our building has lost its fit to the landscape. Refurnishing it, we need to acknowledge that this time a new forest will grow. It will be a stronger forest – it will be indigenous and will grow in relation to the building. In this shifting landscape, it’s not the landscape that needs to be refurnished. It is the building.”

Doing more with less

Prof Smith also discussed two award-winning projects: the ‘Te Whare Nui O Tuteata’ project and the ‘Feather House’. Both projects are examples of his commitment to sustainability and adaptive design – doing more with less.

The ‘Te Whare Nui O Tuteata’ project, part of the New Zealand government’s SCION Timber Research Institute, uses a diagrid timber structure that reduces material usage and allows the building to integrate seamlessly with its forest surroundings. The building was designed with a neutral carbon count, and the timber used was locally sourced, reflecting the natural landscape.

Prof Smith described the building as an educational invitation to visitors to ‘walk in our forest’ and learn new and sustainable ways of resourcing and building with timber. “The building behaves like a forest – the closer you get the more is revealed. Light filtering through its timber framework is also much like sunlight through a forest canopy – enhancing the building’s connection to its surroundings.” 

In discussing the Feather House, Prof Smith highlighted the importance of designing spaces that can evolve with their inhabitants. “Design for the ‘there and then’ rather than for the ‘here and now’,” he said. “One cannot design a room for every occasion, but you can provide an invitation.” He advocates for creating architecture that anticipates future changes and adapts to evolving environments, ensuring that buildings remain relevant and functional over time. His design philosophy underscores connection rather than division of spaces and doing less rather than more to create adaptable and sustainable living environments. “Do not design the space based on whose shoes are in the shoe rack,” he commented. 

News Archive

UFS implements access control measures on our Bloemfontein Campus
2014-11-21



Photo: Hannes Pieterse

Online Application form: non personnel

Map with access gates on the Bloemfontein Campus


Accessing the Bloemfontein Campus from 3 November 2014

Access control during major events on the Bloemfontein Campus

Q&A




The University of the Free State (UFS) has been tightening security measures on its Bloemfontein Campus for quite some time now. Purposefully, we have consolidated several safety measures to keep our students, staff and visitors – the heartbeat of our university – protected.

Our most significant step in this endeavour is now in the process of implementation. All five entrance gates to the campus are being equipped with strict access control.

The first phase of the process was implemented beginning of August 2014. Gates 2 (Badenhorst Street) and 4 (Furstenburg Street) were equipped with card readers. Only persons with valid access cards can enter and leave through these gates. Existing staff and student cards are equipped to be read by the short-distance card readers at the gates in order to activate the booms.

At this stage, staff and students are swiping their cards against the card readers at Gates 2 and 4 or holding it not further than 20 mm from the reader for the boom to open. Card holders now physically stop in front of the boom in order to get access to the campus.  

The duel-frequency card:

The dual-frequency cards available at the Card Division on the Thakaneng Bridge are currently out of stock. New cards will be delivered on Friday 14 November 2014.

The special offer of R30 per access card has been extended to the end of November 2014. To qualify for this offer, staff and students may pay the R30 for a dual-frequency card at the bank or cashiers on the Thakaneng Bridge no later than 28 November.  The cost of dual-frequency cards will increase to R60 per card from 1 December 2014.

Please note that only people with vehicles need to apply for dual-frequency cards.

Students and staff will, however, still be able to gain access to the Bloemfontein Campus with their current cards (in the case of staff and students who haven’t purchased dual-frequency cards yet). As is currently the practice at the gates in Furstenburg and Badenhorst Streets, you will have to stop when you reach the boom, swipe your card past the card reader, the boom will open and you will be able to drive through.

Staff and students using their dual-frequency cards should:

-       Reduce speed
-       Hold the card in a vertical position at the driver’s side window, in the direction of the long-distance reader (see photo)

It is therefore not necessary to stop in front of the boom. On holding your card upright, in line with the card reader, the gate will open automatically and you will be able to drive through (keep your card outside your window; the card reader cannot operate through tinted windows).

Please note that this arrangement only applies to incoming lanes. On leaving the campus, the card has to be swiped. This is due to the number-plate recognition technology installed at exits for additional security.

If the long-distance reader does not work, the dual-frequency card can still be used at a tag reader. 

Applying for your new card:

Electronic fund transfers: Absa Bank: 1 570 8500 71, Ref: 1 413 07670 0198, OR pay the R30 at the UFS Cashiers, Thakaneng Bridge. Please note that the price of the cards will increase to R60 from 1 November 2014.

Take your existing personnel or student card, together with proof of payment, to the UFS Card Division, Bloemfontein Campus, Thakaneng Bridge, to have your photo taken and your new dual-frequency card issued.

Permission to access specific UFS buildings or facilities linked to your existing card, will be automatically linked to the new card.

The new card is marked ‘dual’ on the back in the right, bottom corner.

The UFS Cashiers will provide assistance between 09:00 and 14:30, and the UFS Card Division between 09:00 and 15:00.

Implementation of full access control


Full access control will be implemented on the UFS’s Bloemfontein Campus from 3 November 2014. This means that access control will be implemented at all gates on the Bloemfontein Campus.

Who is using which gate? See Q&A for more information.


Gate 3 (Wynand Mouton Drive) is earmarked for use by official card holders. These include students, staff and persons doing business on campus. Parents dropping and fetching their children for sports, as well as service providers of the UFS, such as architects, may apply for valid cards. These persons will have to provide proof that they have business on campus (complete online application form and sign declaration).

All visitors to the campus will be referred to the Visitor’s Centre at Gate 5 (DF Malherbe Drive). This include, among others, parents, family and friends of students, as well as conference delegates. It is estimated that the Visitor’s Centre will be completed at the end of November (note that the gate at DF Malherbe Drive will be operational by 3 November 2014). Visitors will sign in at the Visitor’s Centre and, depending on the business they have on campus, they will only be allowed on campus for a certain period of time.

•    Lane 1 at Gate 5 will be used by visitors and service providers to enter the campus. Only card holders will be able to use lane 2.
•    Buses and trucks can also enter the campus through Gate 5.

The construction at the Main Gate at Nelson Mandela Drive is to build one extra lane for incoming traffic. The project is estimated to be completed at the end of October 2014.

•    For outgoing traffic, lane 1 (furthest from the guardhouse) and lane 2 will only be used by card holders and lane 3 (closest to the booth) will be used by service providers.
•    For incoming traffic, lanes 2 and 3 were set aside for use by only service providers. Lanes 1 and 4 will be used by only card holders.

Pedestrians

All gates for motorists will also be equipped with a pedestrian thoroughfare on completion of the project. Persons using these pedestrian gates also need to use their cards to get access to the campus.

Pedestrians who are visitors, but aren’t in possession of a valid access card, should please go to the Visitor’s Centre at the gate in DF Malherbe Drive where they will be helped.

More information

For more information on access control at the UFS, please watch our videos and read the Q&A or e-mail your enquiries to accesscontrol@ufs.ac.za.  


Issued by:    Lacea Loader (Director: Communication and Brand Management)
Tel: +27(0)51 401 2584 | +27(0)83 645 2454
E-mail: news@ufs.ac.za


We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept