Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
13 February 2025 | Story Onthatile Tikoe | Photo Supplied
Shimlas 2024
The UFS Shimlas lifting the Varsity Cup on their home ground in Bloemfontein after their 2024 victory.

The highly anticipated Varsity Cup is finally here, and the University of the Free State (UFS) is buzzing with excitement! The tournament, which features the top university rugby teams in South Africa, promises to deliver thrilling matches and intense rivalries throughout the rugby season.

After an exhilarating 2024 season, the UFS Shimlas made history by lifting the Varsity Cup trophy on their home ground in Bloemfontein. The team’s impressive performance and dedication earned them a spot in the record books, and they are eager to repeat their success in 2025.

This year’s competition is scheduled to kick off on 17 February 2025 and will run for 7 weeks, with the UFS final game on 31 March 2025. The UFS Shimlas will be looking to defend their title and bring home the coveted trophy once again.

Previous winners

The Varsity Cup has a rich history, with previous winners including:

UFS Shimlas (2015, 2024)
Maties (Stellenbosch University, 2008-2010, 2019)
Tuks (University of Pretoria, 2012, 2013, 2017, 2021, 2022)
UCT Ikey Tigers (2011, 2014)

FNB NWU (2016, 2023)

UFS ready to take on the best

The UFS Shimlas have been preparing tirelessly for the tournament, with a strong focus on teamwork, discipline, and strategy. Head Coach André Tredoux expressed his excitement about the team’s prospects: “Being the defending champions comes with a bit of pressure, but we don’t see it that way. Our motto is that we want to attack the Varsity Cup, hence the best form of defence is to attack. The boys are really excited. They played well against UJ and scored lots of tries, hence our mindset is to attack everything we put our minds to.”

UFS Shimlas Team Captain Nkoka Ngobe echoed his coach’s sentiments, reinforcing his dedication to leading the team to victory. “As the team captain, I have to lead by example and bring the culture of excellence. I will never ask my teammates to do something that I cannot do, so the important thing for me is doing what it takes so that the boys can do the same.”

Get ready for the action

The Varsity Cup promises to deliver seven weeks of non-stop rugby action, with the UFS Shimlas ready to take on the best university teams in the country. Don’t miss out on the excitement – follow the UFS Shimlas on social media to stay up to date and get ready to cheer them on to victory!

Let’s go, Shimlas!

News Archive

UFS keeps the power on
2015-06-24

 

At a recent Emergency Power Indaba held on the Bloemfontein Campus, support structures at the university met to discuss the Business Continuity Intervention Plan to manage load shedding on the three campuses of the UFS.

Currently, 35 generators serving 55 of the buildings have already been installed as a back-up power supply on the three campuses of the university. According to Anton Calitz, Electrical Engineer at the UFS, the running cost to produce a kWh of electricity with a diesel generator amounts to approximately three times the cost at which the UFS buys electricity from Centlec.

Planned additional generators will attract in excess of R4 million in operating costs per year. For 2015, the UFS senior leadership approved R11 million, spread over the three campuses. Remaining requirements will be spread out over the next three years. University Estates is also looking at renewable energy sources.

On the Bloemfontein Campus, 26 generators serving forty-one buildings are in operation. On South Campus, two generators were installed at the new Education Building and at the ICT Server Room. Lecture halls, the Arena, the Administration Building, and the library will be added later in 2015. Eight generators serving 12 buildings are in operation on the Qwaqwa Campus. In 2015, the Humanities Building, Lecture Halls and the heat pump room will also be equipped with generators.

Most buildings will be supplied only with partial emergency power. In rare cases, entire buildings will be supplied because the cost of connecting is lower than re-wiring for partial demand. According to Nico Janse van Rensburg, Senior Director at University Estates, emergency power will be limited to lighting and power points only. No allowances will be made for air-conditioning.

“Most area lighting will also be connected to emergency power,” he said.

Where spare capacity is available on existing emergency power generators, requests received for additional connections will be added, where possible, within the guidelines. The following spaces will receive preference:
- Lecture halls with the lights, data projectors, and computers running
- Laboratories for practical academic work and sensitive research projects
- Academic research equipment that is sensitive to interruptions
- Buildings hosting regular events

According to Janse van Rensburg, all further needs will be investigated. Staff can forward all emergency power supply needs to Anton Calitz at calitzja@ufs.ac.za

Staff and students can also manage load shedding in the following ways:

1. Carry a small torch with you at all times, in case you are on a stairwell or other dark area when the lights go out. You can also use the flashlight app on your phone. Download it before any load shedding occurs. This can come in handy if the lights go out suddenly, and you cannot find a flashlight. Load-shedding after dark imposes even more pressure on our Campus Security staff. We can assist them with our vigilance and preparedness by carrying portable lights with us at all times and by assisting colleagues.
2. Candles pose a serious safety risk. Rather use battery- or solar-powered lights during load shedding.
3. Ensure that your vehicle always has fuel in the tank, because petrol stations cannot pump fuel during power outages.
4. Ensure that you have enough cash, because ATMs cannot operate without electricity.
5. The UFS Sasol Library has study venues available which students can use during load shedding.
6. When arranging events which are highly dependent on power supply, especially at night, organisers should consult the load-shedding schedule before determining dates and preferably also make back-up arrangements. If generators are a necessity, the financial impact should be taken into consideration.

The senior leadership also approved a list of buildings to be equipped with emergency power supplies.

More about load shedding at the UFS:
Getting out of the dark
More information, guidelines and contact information

 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept