Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
13 February 2025 | Story Onthatile Tikoe | Photo Supplied
Shimlas 2024
The UFS Shimlas lifting the Varsity Cup on their home ground in Bloemfontein after their 2024 victory.

The highly anticipated Varsity Cup is finally here, and the University of the Free State (UFS) is buzzing with excitement! The tournament, which features the top university rugby teams in South Africa, promises to deliver thrilling matches and intense rivalries throughout the rugby season.

After an exhilarating 2024 season, the UFS Shimlas made history by lifting the Varsity Cup trophy on their home ground in Bloemfontein. The team’s impressive performance and dedication earned them a spot in the record books, and they are eager to repeat their success in 2025.

This year’s competition is scheduled to kick off on 17 February 2025 and will run for 7 weeks, with the UFS final game on 31 March 2025. The UFS Shimlas will be looking to defend their title and bring home the coveted trophy once again.

Previous winners

The Varsity Cup has a rich history, with previous winners including:

UFS Shimlas (2015, 2024)
Maties (Stellenbosch University, 2008-2010, 2019)
Tuks (University of Pretoria, 2012, 2013, 2017, 2021, 2022)
UCT Ikey Tigers (2011, 2014)

FNB NWU (2016, 2023)

UFS ready to take on the best

The UFS Shimlas have been preparing tirelessly for the tournament, with a strong focus on teamwork, discipline, and strategy. Head Coach André Tredoux expressed his excitement about the team’s prospects: “Being the defending champions comes with a bit of pressure, but we don’t see it that way. Our motto is that we want to attack the Varsity Cup, hence the best form of defence is to attack. The boys are really excited. They played well against UJ and scored lots of tries, hence our mindset is to attack everything we put our minds to.”

UFS Shimlas Team Captain Nkoka Ngobe echoed his coach’s sentiments, reinforcing his dedication to leading the team to victory. “As the team captain, I have to lead by example and bring the culture of excellence. I will never ask my teammates to do something that I cannot do, so the important thing for me is doing what it takes so that the boys can do the same.”

Get ready for the action

The Varsity Cup promises to deliver seven weeks of non-stop rugby action, with the UFS Shimlas ready to take on the best university teams in the country. Don’t miss out on the excitement – follow the UFS Shimlas on social media to stay up to date and get ready to cheer them on to victory!

Let’s go, Shimlas!

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept