Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
16 January 2025 | Story Dr Cindé Greyling | Photo Supplied
Green Futures Hub
Prof Wayne Truter, who is leading the Green Futures Hub at the UFS, highlights that mining and agriculture are important yet competing industries in South Africa. The hub aims to find sustainable ways for them to coexist.

Our earth is very resilient, and a green future is possible, but we must make changes. At the forefront of this mission is the Green Futures Hub, spearheaded by Prof Wayne Truter at the UFS. Prof Truter holds a PhD in Integrated Agricultural and Environmental Sciences, with more than 25 years of experience. He is a leader in the field of forage, pasture, and land regeneration – particularly those impacted by mining. 

The Green Futures Hub is a virtual platform that bridges academic research and industry gaps, aiming to solve real-world challenges with scientific insights. It is designed to showcase and integrate the research happening across various disciplines at the University of the Free State (UFS), making it accessible to industry and communities alike. “People often lose faith in academic institutions, thinking that the research done there has no practical value,” Prof Truter notes. “The Green Futures Hub aims to change that by making scientific findings accessible and relevant to daily life.” 

This platform offers a unique opportunity for industries to connect with researchers working on solutions related to climate change, sustainable agriculture, or environmental rehabilitation. “Our hub is a space where industries can come to us with their challenges, and we can offer solutions based on research,” Prof Truter explains. “It’s about creating real impact.” 

Collaboration and integration are central to the Green Futures Hub’s approach. “Through interdisciplinary collaboration and a commitment to environmental stewardship, we want to develop solutions to the complex development challenges related to ecosystems, agroecosystems, water resources, biodiversity, infrastructure, and communities,” says Prof Truter. 

One of the hub’s projects that is close to Prof Truter’s heart, is the future coexistence of mining and agriculture. Mining and agriculture are two important industries in South Africa, often competing for land. However, the hub seeks to bridge this gap by exploring how these industries can coexist sustainably.  

“The future coexistence of mining and agriculture is critical,” says Prof Truter. “While mining often uses the land intensively, they have the responsibility and capability to rehabilitate it for agricultural use, ensuring that it is as productive – if not more – than it was before. Farmers and miners have much to gain from each other,” he explains. “By partnering with industries, we can help rehabilitate the land that has been mined, and in turn, farmers can harness and bring back the productivity to that land with the financial inputs of mining companies.” 

Prof Truter also emphasises the importance of science communication. “We need to do better at communicating the value of the research we’re doing. Many times, industries don’t understand the significance of what we’re working on because it’s not explained in a way that resonates with them. The hub ensures that research findings are accessible, understandable, and applicable to real-world issues.”  

The Green Futures Hub is more than just a research platform; it is a testament to the power of collaboration between academia and industry. “We’re not just conducting research,” Prof Truter concludes, “we’re developing solutions.” 

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept