Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
07 March 2025 | Story Anthony Mthembu | Photo Supplied
Crystal-Donna Roberts
Crystal-Donna Roberts, recipient of the 2016 Kovsie Ambassador Award and award-winning actress, has died following a battle with breast cancer.

The University of the Free State (UFS) is deeply saddened by the passing of alumna and award-winning actress Crystal-Donna Roberts at the age of 41. According to Eyewitness News (EWN), Roberts passed away during the early hours of 6 March 2025, following a long battle with breast cancer.

The UFS extends its deepest condolences to Roberts’ family, friends, colleagues, and supporters.

Celebrating a beloved actress

Roberts graduated from the UFS with a BA Drama and Theatre Arts degree in 2005 and went on to create work that was beloved across the country and beyond. She starred in the Afrikaans soap opera 7de Laan and shows like Getroud Met Rugby, Montana and Vallei van Sluiers, among others. Her lead role in the film Krotoa earned her the Best Actress award in 2018 at the South African Film and Television Awards (SAFTAs).

Her extensive career in film and television was one of the reasons she was recognised by the UFS with the Kovsie Ambassador Award in 2016. This is an award given to alumni whose accomplishments have not only benefited themselves but their community and the UFS. Although Roberts was well-known for her work on stage and screens, she was also an author. She released her debut novel Speurder Sammi: Die blou steen (Detective Sammi: The Blue Stone) in 2022.

Outpouring of praise

Since the news of Roberts’ passing broke, there has been an outpouring of tributes on social media. Many of her supporters and colleagues have described her as an iconic force who was full of life and inspired many. Alistair Izobell, who starred alongside Roberts in Arendsvlei, responded to the news through a Facebook post which said, “My dearest sister Crystal-Donna Roberts my heart is broken today. You got your wings and your pain is no more. I am thrilled I got to do a chapter of my life with you. I will remember you with the great spirit you were. Now rest sweetly.”

News Archive

Getting out of the dark
2015-04-28

Photo: Leonie Bolleurs

Since 2008, the University of the Free State has been busy with the planning and implementation of projects to reduce the impact of load shedding. To date,  the cost of these projects has run to R6 million. They have been done primarily to ensure that the academic programme does not suffer damage as a result of the increasing interruptions in the power supply that are continuing this year.

The university’s greatest concern has been the provision of emergency power to the lecture halls and laboratories.

Thus far, 35 generators are servicing 55 buildings on the three campuses of the UFS. This includes 26 generators on the Bloemfontein Campus, eight on the Qwaqwa Campus in the Eastern Free State, and one generator on the South Campus in Bloemfontein. The generators are already in service, and are maintained in working order.

Since 2010, the university has also ensured that all newly-built academic buildings are equipped with emergency power supplies.

On the South Campus in Bloemfontein, the new lecture-hall building and the computer laboratory are equipped with emergency power, while the installation of emergency generators in other buildings is under way. The majority of the buildings on the Qwaqwa Campus in the Eastern Free State are equipped with emergency power supplies.

In the meantime, the UFS management has approved a further R11 million for the installation of additional generators on the three campuses. A further R1.5 million has also been approved for the purchase of two mobile generators.

To extend the work already done, the main task will be the installation of more generators on the Bloemfontein Campus to ensure that lecture halls with emergency power will be available for the centrally-arranged timetables, and to ensure that more of the critical laboratories will be provided with emergency power.

There are still  some important buildings and halls on the Bloemfontein Campus that must be supplied with emergency power. However, it is a costly process and must be brought into operation gradually. The further implementation of emergency power depends on the delivery of equipment. The university is also investigating alternative solutions for power provisioning, including solar power.

Generators with spare capacity are optimally deployed to satisfy the lower needs of the campus, including the Odeion, the ANNEX at Microbiology, the Stabilis ANNEX, the Agriculture Building, the UV-Sasol library, and the Francois Retief Building.

In addition, the UFS  is busy on all campuses, coupling area lighting, including

street lights and pedestrian walkways, to existing generators. Procedures for the operation of mechanical equipment, such as entrance gates, lifts, and so on, are currently being dealt with on all campuses. Continuous power sources for certain ICT equipment will be installed on all campuses to protect it against power surges.

Staff and students can also equip themselves with the necessary knowledge to manage load shedding in their specific areas of work and study. It is always helpful to know who to contact. The following list with guidelines and contact numbers has been compiled to assist you:

1. In an emergency, call Protection Services. This line will continue to operate, regardless of whether the power is on or off.
2. Avoid using lifts just before planned load shedding. Some lifts have emergency power packs which will bring the lift to the nearest floor and open the doors. If you still get stuck in a lift during a power outage, use your cellphone to call Protection Services. While you're waiting, stay calm and be patient.
3. If the access control systems in your building stop working after load shedding, contact Protection Services.
4. The students and staff members who are most at risk during load shedding are those in wheelchairs or with other mobility limitations. As far as possible, plan ahead to avoid being stuck on a floor or in a room that is difficult to access when load shedding is imminent. Please contact Protection Services if you need assistance.
5. During a fire, alarms WILL go off. Alarms are not power driven, but battery driven. For assistance, contact Protection Services.
6. The main UFS Switchboard (Bloemfontein Campus +27(0)51 401 9111 and Qwaqwa Campus +27(0)58 718 5000) will continue to operate during load shedding.

Contact details of Protection Services:

  • Bloemfontein Campus: +27(0)51 401 2634/2911
  • Qwaqwa Campus: +27(0)58 508 5460/5175
  • South Campus: +27(0)51 5051217

Communication and Brand Management will make information available on the UFS web, Facebook page, Twitter, Blackboard and the intranet. Get the load shedding schedule from Eskom’s webpage (http://loadshedding.eskom.co.za/). The Bloemfontein Campus falls in group 4 and the South Campus falls in group 2 in Centlec’s load shedding schedule.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept