Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
07 March 2025 | Story Anthony Mthembu | Photo Supplied
Crystal-Donna Roberts
Crystal-Donna Roberts, recipient of the 2016 Kovsie Ambassador Award and award-winning actress, has died following a battle with breast cancer.

The University of the Free State (UFS) is deeply saddened by the passing of alumna and award-winning actress Crystal-Donna Roberts at the age of 41. According to Eyewitness News (EWN), Roberts passed away during the early hours of 6 March 2025, following a long battle with breast cancer.

The UFS extends its deepest condolences to Roberts’ family, friends, colleagues, and supporters.

Celebrating a beloved actress

Roberts graduated from the UFS with a BA Drama and Theatre Arts degree in 2005 and went on to create work that was beloved across the country and beyond. She starred in the Afrikaans soap opera 7de Laan and shows like Getroud Met Rugby, Montana and Vallei van Sluiers, among others. Her lead role in the film Krotoa earned her the Best Actress award in 2018 at the South African Film and Television Awards (SAFTAs).

Her extensive career in film and television was one of the reasons she was recognised by the UFS with the Kovsie Ambassador Award in 2016. This is an award given to alumni whose accomplishments have not only benefited themselves but their community and the UFS. Although Roberts was well-known for her work on stage and screens, she was also an author. She released her debut novel Speurder Sammi: Die blou steen (Detective Sammi: The Blue Stone) in 2022.

Outpouring of praise

Since the news of Roberts’ passing broke, there has been an outpouring of tributes on social media. Many of her supporters and colleagues have described her as an iconic force who was full of life and inspired many. Alistair Izobell, who starred alongside Roberts in Arendsvlei, responded to the news through a Facebook post which said, “My dearest sister Crystal-Donna Roberts my heart is broken today. You got your wings and your pain is no more. I am thrilled I got to do a chapter of my life with you. I will remember you with the great spirit you were. Now rest sweetly.”

News Archive

Getting out of the dark
2015-06-10

 

ESKOM is making daily announcements on the status of the power grid.

Anton Calitz, Electrical Engineer at University Estates, is in continuous contact with Eskom and Centlec in an effort to stay abreast of load shedding.

According to Anton, Eskom has recently - the week of 20 April - been focusing on the evening peak, and has announced STAGE 1 load shedding from 17:00-22:00; thus, the Bloemfontein Campus should be able to continue business as usual during the day, except for Thursdays from 18:00 and, possibly, Fridays from 17:00.

Where can I get more information about load shedding stages?

Apart from Eskom’s webpage, staff can also visit GRID WATCH. Click on "Search", then under "Schedules". Look for "Mangaung Local Municipality", and select "GROUP 4". Save this location. “This can even be loaded onto your mobile device.”

“The time slots can be seen for a couple of days in advance, to allow us to plan around the possibility of load shedding in our daily lives,” said Anton.

Please note: ESKOM can change the STAGE level at any time. Therefore, keep an eye on GRID WATCH and News24.

View the typical seven-day planner for the Bloemfontein Campus (Group 4), which indicates the STAGE 2 and 3 possibilities. Take note that, on some days, the STAGE 2 and 3 time slots are the same.

More load shedding tips: Your IT needs

The UFS Data Centre (Computer Room) is fully serviced by a generator facility, and can function without external power supply for a few days.

The generator servicing the UFS data centre does NOT provide power to the outlying facilities. This implies that all digital equipment at gates, booms, and access points will be shut down until the power is restored to these facilities. “We are now, in collaboration with Nico Janse van Rensburg, in a process to install UPS facilities at these points, which will ensure two to three hours of power supply at these points, even during load shedding,” said Dr Vic Coetzee, Senior Director: ICT Services.

No Wi-Fi will be available, as it is dependent on the power supply to the buildings where it is installed.

All servers are contained in the data centre, and will be kept running by our generators.

How to manage load shedding and your IT needs:

1. Get into the habit of saving your work regularly on computer so that you don’t lose your work/files during load shedding.
2. Back up important data. Keep to a schedule of regular back-up.  Make sure your computer back-ups are safe and recoverable.
3. Keep all electronic devices charged and ready to run on battery power. Keep your cellphone charged: some old-style Telkom landlines will still operate during power outages, but others won't.
4. Remember, when power supply is restored, it sometimes happens that a power surge is sent through the network, which will damage your computer.  Fortunately, laptop computers will not suffer this fate as their power is provided through an external power pack. Often, this power pack will be damaged, but not the laptop itself.
5. It makes good sense to reboot your computer daily, not only in terms of power shedding, but also in terms of updating the drivers, software, etc.
6. Switch off all computers and other electrical equipment at the wall plug overnight and on weekends.
7. Should your IT equipment not switch on after a power outage, log a call with the ICT Services. You can also call them at x2000.

More information, guidelines and contact numbers

 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept