Latest News Archive

Please select Category, Year, and then Month to display items
Years
2019 2020 2021 2024
Previous Archive
31 March 2020 | Story Leonie Bolleurs | Photo Gerhard de Jager
Prof Linda Basson recently returned from a three-month research expedition in Antarctica. Here she is, relaxing on the ice with the ever-inquisitive Adelie penguins having a gander at these strangers in their snowy world.
Prof Linda Basson recently returned from a three-month research expedition in Antarctica. Here she is, relaxing on the ice with the ever-inquisitive Adelie penguins having a gander at these strangers in their snowy world.

Very little is known about the parasites of Antarctica, which is a highly productive part of the oceans. These small organisms can be used very successfully to determine the health of this fragile ecosystem.

“Our research data can make significant contributions to the biodiversity of parasites, for a start. The data can also be very valuable to indicate the overall health of this large ecosystem – an ecosystem that drives many of the life-giving processes on our planet.” This is the belief of Prof Linda Basson from the Department of Zoology and Entomology at the University of the Free State (UFS). 

She is an aquatic parasitologist who concentrates on various parasites from a wide range of hosts, including vertebrates (fish and amphibians) and invertebrates (plankton, urchins, starfish, sea cucumbers and red-bait).

Prof Basson, together with PhD student Gerhard de Jager, was invited by Prof Isabelle Ansorge, Head of the School of Oceanography, University of Cape Town, to join her research team on the South African National Antarctic Programme (SANAE) Voyage 59 to Antarctica. 

Widen the scope of research 
“Our aim on this trip was to determine how we can collaborate with the various oceanographers to widen the scope of research normally performed on these voyages, in order to also include parasitological aspects. Once we arrived on the continent of Antarctica, we worked to collect a range of hosts from the Southern Ocean to screen these for the whole array of parasites,” she explains. 

No research of any kind on aquatic parasites has ever been done in Penguin Bukta and Akta Bukta, the specific areas where Prof Basson was based with other scientists and the rest of the Agulhas crew.

She adds: “Our research will contribute to the wider knowledge of parasites in marine environments, but specifically in this area where little to nothing is known.”

A chance of a lifetime 
“Antarctica was literally one of the top research destinations on my bucket list. Travelling to and working in Antarctica is a lifelong dream of mine. It was a chance of a lifetime that I could not miss out on,” says Prof Basson. 

Sharing her experience, she says a typical day on board the SA Agulhas II in Antarctica will start with a cup of good, quality coffee and a look at the prevailing weather on the stern of the ship. 

“One would always be amazed by the beautiful, ceaselessly changing water, the restless sea ice and the impressive ancient ice shelf in very invigorating temperatures, while an ethereal Snow Petrel swirls past and the occasional Adelie penguin comes to gaze and contemplate the presence of this large red structure floating in their habitat and obscuring their view. After tearing yourself away from this, the rest of the day would be spent either in the well-equipped laboratory working through collected samples, or else planning the next exciting collection in the intensely cold water.”

Remarkable journey 
To eternalise memories of this unique experience of almost three months, Prof Basson says that, “One cannot go without a fully charged camera with a large SD card, ready to capture the many facets of this exceedingly fragile but enchanting world of ice and sky, ever changing and all in innumerable shades of white”.

“This truly remarkable journey will forever be associated with a myriad of brilliant highlights.”

Finding it extremely difficult to single out a specific highlight, she listed a long list of memorable events, but as a scientist she will always remember “realising the wealth and cornucopia of microscopic life present in the southernmost of our oceans and seeing this first-hand under the microscope”.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 