Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
12 July 2019 | Story Leonie Bolleurs
Unique building project
Students from the Department of Architecture and their lecturer, Hein Raubenheimer, building a new future for colleague Adana and her family. In 2018 the builders decided to use a combination of clay bricks and earth bricks as major construction material.

When a colleague in the Department of Architecture bought a plot of land in 2014, her joy knew no bounds and she could not wait to share the news with fellow colleague, Hein Raubenheimer.

Raubenheimer, a lecturer in the department, could not help but think that Adana (pseudonym) would, “like many others, promptly erect a ‘dwelling’ of affordable second-hand material”. This made him muse on how he could help in erecting a more ‘permanent’ house for her, her son and daughter.

He related: “The first-year hut-building project was in the making, and my involvement with it made me think about the possibilities of reusing the earth bricks that were formed during the building process for a potential earth-brick dwelling. However, the quality of such bricks could not be guaranteed and a more controlled manner of forming earth bricks had to be investigated.”

Interdisciplinary research
After talking to an architect friend, JT Erasmus, about the possibility of sustainable forms of building an informal dwelling, Raubenheimer was brought into contact with a colleague in the Department of Chemistry, Dr Elizabeth Erasmus. Together, he and Dr Erasmus formulated and submitted an application for interdisciplinary research. Their application was to investigate the testing of polymer-stabilised earth bricks. “To our surprise, our application was successful. The funds prompted us to immediately start preparing the site and purchasing the necessary equipment for making stabilised earth bricks,” said Raubenheimer.

He elaborated: “During the first two years, all the first- to third-year students were involved in the earthworks, foundations, and making of earth bricks. Since 2018, Prof Gerhard Bosman, Associate Professor in the Department of Architecture, became involved with the fourth-year students, focusing on the finishing touches of the building project as well as the service components.”

Economically viable
For the project to be economically viable, the layout of the floor plan was as compact as possible (35 m²). Raubenheimer explained: “Three areas (living, sleeping, washing) were arranged to create some privacy with the minimum structure. The sleeping area was a double volume with a proposed mezzanine floor that could function as a ‘loft’ (second sleeping area).”

According to Raubenheimer, they wanted to build the entire house with stabilised earth bricks, but due to the labour-intensive and time-consuming process of making the bricks, they decided in 2018 to use a combination of clay bricks and earth bricks as major construction material.

Bloemfontein opens its heart

Apart from the approximately 200 Architecture students and lecturers involved in the project, the community of Bloemfontein also opened their hearts and hands widely.

“We were very lucky to get the roof sheets as donation – surplus as a result of the colour difference (Safintra Roofing), a lightweight-steel construction company (Siteform) sponsored the roof structure, UFS Facilities Management donated all the windows (from their scrapyard), and a well-known Bloemfontein construction company (Sebedisan Construction) delivered lots of recycled material with a three-ton truck. There were also several private cash donations from alumni of the Department of Architecture. Local artisans, Diphapang Machabe, April Milela, Kabelo Lando, and Petrus Letsoara also assisted with the project.

With the use of recycled material and earth bricks, the CO2 footprint of the building was minimal. Raubenheimer explained that the small areas with good North orientation, together with the good insulating properties of the earth bricks, is making the interior very comfortable throughout the year. “Good insulation of the roof and ‘loft’ will minimise the need for heating and cooling,” he said.

Hope for the future
If everything runs smoothly, the project will be completed in the spring of 2019. “And then we will have a proper house-warming. Up until now, each phase of the project was an adventure for Adana. In the beginning, she could not believe that anything would come of it; but her appreciation, despite the prolonged construction period, has grown,” said Raubenheimer.

On a personal level, this project also meant a lot to Raubenheimer. “The limited finances and possibility of applied low technology, experimental forms of detailing all contributed to the adventure. The greatest learning curve for me, however, was to experience the ‘neighbourhood’. The most wonderful respect for life on the faces of neighbours and passers-by. The fact that people here seem to have nothing, but then the perception that as a community they have so much caring, time, and love for each other, has given me hope.”

News Archive

Access to the Bloemfontein Campus
2015-04-02

Access Control Made Easy

The first phase of access control at the University of the Free State (UFS) was implemented in August 2014. The aim of this initiative is to tighten security measures on the Bloemfontein Campus.
 
Since November 2014, access control has been implemented at all five gates on the Bloemfontein Campus. These are:

  • The Main gate in Nelson Mandela Drive (Gate 1)
  • The gate in DF Malherbe Drive (Gate 5)
  • The gate in Wynand Mouton Drive (Gate 3) 
  • The gate in Furstenburg Street (Gate 4)
  • The gate in Badenhorst Street (Gate 2)

Here is some useful information about the access control system:

1. Remember your access card when you enter the campus

Dual-function cards (with distance reader compatibility) will make your movement through the gates more convenient. The university’s access system works automatically with remote or swipe action. Please make sure that you drive close to the reader or, better still, get the dual-frequency card to manage the distance between your vehicle and the remote card reader.

As of 23 March 2015, the extra security staff, who have been assisting at the gates since the implementation of access control on the Bloemfontein Campus, are no longer manning the card readers at the gates. Therefore, persons without cards will be able to enter the campus only at the one gate in DF Malherbe Drive where the Visitors Centre is situated. They will be referred to the Visitors Centre, where a day visitor’s card will be issued to them. You will need to produce a formal identification document (e.g. ID book, driver's licence).

Security will continue their normal duties at the guardhouses for the various gates on the campus.

2. Where do I get an access card?

You can apply at the university’s Visitors Centre front desk by producing your positive identification (ID book/passport/driver’s licence) and proof of payment for your access card.

You will then be directed to the Thakaneng Bridge where you will be able to collect your access card.

  • Go to the Cashier on the Thakaneng Bridge and pay your R65 for the dual-frequency card
  • Take your receipt, together with your existing card (if you have one), to the Card Division on the Thakaneng Bridge (next to Mellins Optometrists)
  • A new photo will be taken of you at the Card Office for your new card. Your new card will then be issued immediately.

Currently, there is a sufficient stock of the dual-frequency cards available at the Card Division on the Thakaneng Bridge.
 
Alternatively, you can apply online for your access card: http://apps.ufs.ac.za/cardapplication/application.aspx

Make sure you have the following documents ready to attach when completing the online form:

  • Copy of positive identification: ID/Driver's Licence/Passport
  • Signed declaration (http://supportservices.ufs.ac.za/dl/Userfiles/Documents/00007/4668_eng.pdf) by your service provider/employer (if you are a service provider) or a letter of confirmation from your spouse/partner/relative/coach/relevant UFS staff member or student in cases where you have to visit, pick-up or drop off your spouse/partner/relative frequently on the UFS Bloemfontein Campus.

Cost: R65 for a long-term card and free of charge for short-term visits and conference delegates. Pay at the Cashier on the Thakaneng Bridge or at Absa Bank, Account Number: 1 570 8500 71, Ref: 1 413 07670 0198.

3. Cutoff Date: 7 April 2015

After 7 April 2015, no pedestrian or motorist will be able to enter the campus without a valid access card. Persons without access cards will have to enter the campus at the gate in DF Malherbe Drive where the Visitors Centre is situated. You will then be referred to the Visitors Centre where you will have to apply for a day visitor’s card. It is important to note that no one will be able to enter the campus at the Visitors Centre without a formal identification document (e.g. ID book, driver's licence).

4. Dual-frequency card simplifies access to the campus

It is important to have your card ready on entering the campus.

This card will simplify access to the campus considerably, as the card reader will read the card when it is held in a vertical position at the driver’s side window in the direction of the distance reader. Please do not place the card on the dashboard. There is an antenna wire in the card. If the card is placed on the dashboard, you are not exposing the card surface to the reader, and that might influence the antenna’s response to the reader.

Remember, the distance between the reader and the boom is only a few metres.  If you approach the reader at a ’high’ speed, you are not allowing the system to identify your card, match it to the entry in the database, check if you are ‘legal’, and then send a signal to open the boom. 

All five gates are equipped with distance readers. Within the next three weeks, two extra distance readers will also be installed at the Main Gate in Nelson Mandela Drive.
 
Please note that the dual-frequency card is needed only when you enter the campus with a vehicle and you want to activate the distance reader. All the older cards will continue to work at the tag readers. 

5. Use alternative gates

At times, some of the gates carry more traffic than others, especially with the peak morning and afternoon traffic. Gates with less traffic include:

  • The gate in Badenhorst Street
  • The gate in DF Malherbe Drive
  • The gate in Nelson Mandela Drive

You are welcome to make use of one of these alternative gates.

6. Pedestrians

No pedestrian will be able to enter the Bloemfontein Campus without a valid access card. If you have left your card at home or have lost it, you should enter the campus at the gate in DF Malherbe Drive where the Visitors Centre is situated. You will be referred to the Visitors Centre where you can apply for a day visitor’s card. You will still need to produce a formal identification document (e.g. ID book, driver's licence).

7. More information

Email: visitorscentre@ufs.ac.za
Visitors Centre front desk: Tel: +27 51 401 7766 (Mondays-Fridays 07:45-16:30)
Card Division: Tel: +27 51 401 2799 (Mondays-Fridays 07:45-16:30)
Protection Services duty room: +27 51 401 2634 (24 hours)

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept