Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
19 July 2019 | Story Valentino Ndaba | Photo Charl Devenish
MEC for Education, Dr Tate Makgoe, presents an award to Khesa Maphakiso from Beacon High School at the ceremony.
MEC for Education, Dr Tate Makgoe, presents an award to Khesa Maphakiso from Beacon High School at the ceremony.

Projections indicate that by 2020 about 80% of all jobs will require some level of competency in Science, Technology, Engineering and Mathematics (STEM). Also, given the rising unemployment rate and the subsequent demand for entrepreneurial skills in the past few years, STEM education has become a priority for South Africa.

A step in the right direction

Equipping young people to be efficient in the world of work and business is a major driver behind the country’s education system. The MEC for Education in the Free State reiterated the importance of STEM subjects. Dr Tate Makgoe addressed about 200 top-performing Grade 12 learners from quintile 1-3 schools in the province who were attending the South African Institute for Chartered Accountants (SAICA) maths camp.

Making mathematics fashionable

The week-long camp recently closed with an awards ceremony which was held on the Bloemfontein Campus of the University of the Free State (UFS). Nine of the creams of the crop of matric learners were honoured for their achievements in mathematics, physical science, and accounting.

Zinhle Gumbi, from Morena Mokopela Secondary School, one of the three Mathematics Top Achiever award recipients has become more determined to choose a maths-related profession. “I have told myself that any career I follow must include maths. Dr Tate Makgoe said we must prove to people that the black child can do it.”

Emerging as one of the Accounting Top Achievers was Albert Ramatsekane from Tsoseletso Secondary School who intends to pursue a Chartered Accountant (CA) qualification. “The camp has boosted my confidence. Now I can choose the CA stream without thinking twice.” 

Sowing the seed and reaping the fruits

Accounting lecturer Mojalefa Mosala was satisfied with the results of the camp. “I am happy to see many familiar faces in my classes who have attended previous camps. It means we’re doing something right.”

Mosala, a former assistant camp organiser, has confidence in the project as it “affords a rare opportunity to learners who have not been exposed to information, the higher learning environment, study skills and motivational figures to experience all of these”. 
Kovsies prides itself in partnering with industry stakeholders to build the future of the country, one maths camp at a time.



News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept