Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
15 December 2021 | Story Nondsindiso Qwabe | Photo Supplied
Bachelor of Education third-year student, Moeketsi ‘Escalator’ Ngesemane.

By day he is a third-year Bachelor of Education student on the Qwaqwa Campus, but this young man is a Sesotho music maestro with a deep-rooted passion for traditional music and a diligent devotion to unearthing new talent and connecting more people to the cultural artistry that Sesotho music has to offer.

Moeketsi Ngesemane, better known as ‘Escalator’ in the world of music, is only 22 years old, but he has already released one solo album and featured in two more, leads a group of more than 80 traditional singers and dancers, and is responsible for a string of groups around Qwaqwa. He has made strides far beyond his age, and Ngesemane says he is only getting started. He was also instrumental in coordinating the Qwaqwa traditional groups that performed during this year’s Multilingual Mokete festival, where he also featured.

Born and bred in Qwaqwa, Ngesemane pins his love for traditional music as something that was cultivated in his childhood while singing traditional songs with his mother and brother. “My mother is a traditional healer, so Sesotho music was a big part of my upbringing. As I grew older, my brother and I would perform in town and people would give us money. I have not looked back since.”

He cemented himself as an artist and artist manager in his first year in 2009. The name ‘Escalator’ came about in an uncanny way, as he fondly recalls. “I had a friend who was afraid of escalators when he first saw it – but I wasn’t, so he named me ‘Escalator’. I hated the name until I personalised the meaning behind it. It is able to take people from one point to another and from one level to another, which is something I am passionate about doing through traditional music, so the name was fitting.”

He captivated the minds and hearts of both young and old people who want to be under his leadership, and he grooms young people as young as ten, who will also thrive and take traditional praise singing and dancing to greater heights. This, he says, helps him alleviate some responsibilities so that he can focus on his schoolwork.

Celebrating the Sesotho culture through music

Word about his music skill often spreads quickly. “Even when I am on teaching practicals at different schools, once learners find out what I do, they ask to join my group and I can’t say no. Their ages range from 7 to 21, and I know that my group will have more than 100 members before the year ends,” he said.

He often puts together music shows with his group around Qwaqwa. This, he says, he does to promote Sesotho music and art.

Ngesemane has been selected to represent the Basotho Kingdom at the Indoni Mr and Miss Cultural South Africa – an indigenous event focused on promoting South Africa’s diverse cultural heritage, taking place at the Durban ICC on 17 December. He describes this as a dream come true.

“It’s a great honour to be representing the Basotho culture. I have discovered that young people, especially, have neglected their cultural roots and often look down on traditional music and regalia. I’ve made it my personal aim to promote and uphold the Sesotho culture through praise singing and dancing.”

You can vote for Ngesemane by SMS’ing ‘Indoni Mr Sotho’ to 33616.

News Archive

Getting out of the dark
2015-04-28

Photo: Leonie Bolleurs

Since 2008, the University of the Free State has been busy with the planning and implementation of projects to reduce the impact of load shedding. To date,  the cost of these projects has run to R6 million. They have been done primarily to ensure that the academic programme does not suffer damage as a result of the increasing interruptions in the power supply that are continuing this year.

The university’s greatest concern has been the provision of emergency power to the lecture halls and laboratories.

Thus far, 35 generators are servicing 55 buildings on the three campuses of the UFS. This includes 26 generators on the Bloemfontein Campus, eight on the Qwaqwa Campus in the Eastern Free State, and one generator on the South Campus in Bloemfontein. The generators are already in service, and are maintained in working order.

Since 2010, the university has also ensured that all newly-built academic buildings are equipped with emergency power supplies.

On the South Campus in Bloemfontein, the new lecture-hall building and the computer laboratory are equipped with emergency power, while the installation of emergency generators in other buildings is under way. The majority of the buildings on the Qwaqwa Campus in the Eastern Free State are equipped with emergency power supplies.

In the meantime, the UFS management has approved a further R11 million for the installation of additional generators on the three campuses. A further R1.5 million has also been approved for the purchase of two mobile generators.

To extend the work already done, the main task will be the installation of more generators on the Bloemfontein Campus to ensure that lecture halls with emergency power will be available for the centrally-arranged timetables, and to ensure that more of the critical laboratories will be provided with emergency power.

There are still  some important buildings and halls on the Bloemfontein Campus that must be supplied with emergency power. However, it is a costly process and must be brought into operation gradually. The further implementation of emergency power depends on the delivery of equipment. The university is also investigating alternative solutions for power provisioning, including solar power.

Generators with spare capacity are optimally deployed to satisfy the lower needs of the campus, including the Odeion, the ANNEX at Microbiology, the Stabilis ANNEX, the Agriculture Building, the UV-Sasol library, and the Francois Retief Building.

In addition, the UFS  is busy on all campuses, coupling area lighting, including

street lights and pedestrian walkways, to existing generators. Procedures for the operation of mechanical equipment, such as entrance gates, lifts, and so on, are currently being dealt with on all campuses. Continuous power sources for certain ICT equipment will be installed on all campuses to protect it against power surges.

Staff and students can also equip themselves with the necessary knowledge to manage load shedding in their specific areas of work and study. It is always helpful to know who to contact. The following list with guidelines and contact numbers has been compiled to assist you:

1. In an emergency, call Protection Services. This line will continue to operate, regardless of whether the power is on or off.
2. Avoid using lifts just before planned load shedding. Some lifts have emergency power packs which will bring the lift to the nearest floor and open the doors. If you still get stuck in a lift during a power outage, use your cellphone to call Protection Services. While you're waiting, stay calm and be patient.
3. If the access control systems in your building stop working after load shedding, contact Protection Services.
4. The students and staff members who are most at risk during load shedding are those in wheelchairs or with other mobility limitations. As far as possible, plan ahead to avoid being stuck on a floor or in a room that is difficult to access when load shedding is imminent. Please contact Protection Services if you need assistance.
5. During a fire, alarms WILL go off. Alarms are not power driven, but battery driven. For assistance, contact Protection Services.
6. The main UFS Switchboard (Bloemfontein Campus +27(0)51 401 9111 and Qwaqwa Campus +27(0)58 718 5000) will continue to operate during load shedding.

Contact details of Protection Services:

  • Bloemfontein Campus: +27(0)51 401 2634/2911
  • Qwaqwa Campus: +27(0)58 508 5460/5175
  • South Campus: +27(0)51 5051217

Communication and Brand Management will make information available on the UFS web, Facebook page, Twitter, Blackboard and the intranet. Get the load shedding schedule from Eskom’s webpage (http://loadshedding.eskom.co.za/). The Bloemfontein Campus falls in group 4 and the South Campus falls in group 2 in Centlec’s load shedding schedule.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept