Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
26 July 2021 | Story Nonsindiso Qwabe | Photo Nonsindiso Qwabe
On top of the Drakensberg. The ARU and Witsieshoek Mountain Lodge research team are, from the left: Grant Martin, Dr Ralph Clark, Jan van Niekerk, Prof Aliza le Roux, Prof Peter Taylor, and Dr Sandy Steenhuisen.

All mountains around the world have native and non-native species that are expanding their ranges quite dramatically; however, little research has been conducted towards understanding the long-term redistribution of species and the effects of global change on biodiversity.


The Afromontane Research Unit (ARU) on the University of the Free State Qwaqwa Campus – as part of the Mountain Invasion Research Network – has secured a two-year EU Horizon 2020 project under the Department of Science and Innovation, which will be looking at the mechanisms underlying the success and impact of range-expanding species on biodiversity and ecosystem functioning.

On Monday 19 July 2021, the ARU took a few of its researchers on a scenic helicopter ride to the summit of the Drakensberg for an alpine field-experiment site inspection of the Mont-aux-Sources peak, one of the highest sections of the Drakensberg range. This site has been identified for the project which the research unit will be leading on mountain research.

ARU Director, Dr Ralph Clark, said the project would explore the effects of global change, biological invasions (when species invade new geographic regions), as well as climate and land-use change. He said experiments were needed to explore the various possibilities and to test the extent to which species respond to experimental treatments. The project would therefore be conducting experiments for two years using open-top chambers – causing an increase in temperature of 3 or 4 degrees to what you find naturally – on plant species from lower down to the top of the mountain, to see how they function. “This will give us an idea of whether they will be able to survive in global warming scenarios. If temperatures get warmer, we might start seeing a lot of plants up here that we wouldn’t otherwise find here.”

Dr Clark said little is known about the long-term monitoring of species distribution and the effects of global change. Implementing the project in the Maloti-Drakensberg alpine area will therefore put the area in the global mountain research arena. The elevational gradient in the Maloti-Drakensberg Mountains provides space to explore the key processes underlying the variation in species elevation with climate change. “One of the things we don’t know much about are alpine systems. We are hoping to establish a long-term alpine research site and try to add as many studies as we can. The more science we can bring up here, the more we can know about mountain life. What happens on mountains has a lot of impact on social dynamics.

“This project is looking to see what is driving range expansion. Every mountain has its own context. In the Swiss alpine, fires are not a big factor, but fires are one of the biggest factors on our mountains. Some of our native and non-native species are therefore fire-driven, so as fire increases, you might have them spreading faster.”

Listen to the article:

News Archive

R40 million construction contract with black empowerment group starts at UFS
2006-09-04

During the ceremonial kick-off of the biggest construction project in the history of the UFS were from the left: Ms Vuyiwe Mkhupha (Manager of   Sikeyi Construction), Prof Frederick Fourie (Rector and Vice-Chancellor of the UFS) and Prof Steve Basson (Head of the UFS Department of Chemistry). Photo: (Gerhard Louw)

R40 million construction contract with black empowerment group starts at UFS   

The biggest construction contract in the history of the University of the Free State (UFS) to the value of R40 million has started on the Main Campus in Bloemfontein.  The contractors are Ströhfeldt Construction, in a joint venture with Sikeyi Construction, a black empowerment partner.

The contract comprises the extensive modernising, refurnishing and extension of the Chemistry Building.  This is the highest amount the UFS has ever spent on the refurnishing of a building. 
 
A number of initiatives have contributed to the fact that the UFS Department of Chemistry is one of the foremost chemistry departments in the country:
 

  • Expensive equipment and apparatus to the value of almost R20 million were acquired by the department the past year;
  • The basis of this is a strategic partnership with Sasol, the biggest research and development company  in the country;
  • The purchase of the most advanced 600MHz nuclear magnetic resonance spectro meter in Africa;
  • The purchase of a single crystal X-ray diffractometer; and
  • The purchase of a differential scanning calorie meter, used to test the effect of heat on chemicals.  This apparatus comprises of the most advanced detectors in the world.

“Natural scientists need the necessary equipment, apparatus and laboratories to be able to exercise world-class science.  Three years ago the UFS top management made a strategic decision to focus strongly on research and on our  laboratories and lecture halls,“ said Prof Frederick Fourie, Rector and Vice-Chancellor of the UFS, during the launch of the Chemistry Building’s refurbishment.

“I regard this project as a symbol of our investment in science and the academy,“ said Prof Fourie.

Prof Fourie said that the UFS spent almost R100 million in the last 5 years to renovate the Main Campus.  New buildings such as Thakaneng Bridge were built and other such as the Reitz Dining Hall was renovated and converted into the Centenary Complex.  “These projects, together with the refurbishment of the Chemistry Building, also show how the UFS contributes to the development and growth of not only Bloemfontein, but also how we invest in the Free State,“ said Prof Fourie.

According to Ms Edma Pelzer, Director: Physical Planning and Special Projects at the UFS, the current building originally comprised of the Moerdyk Building built in 1949 and a newer wing built in 1966.  This building became too small and obsolete and a new part is now being added to the eastern side.
  
According to Ms Pelzer a great deal of the project comprises the dramatic upgrading and modernising of laboratories, existing mechanical systems and the installation of new systems.  “The nature of the work of staff and students demands sophisticated mechanical systems such as air conditioning, fume hoods, the provision of gas, etc and therefore these received specific attention.  The research laboratories, lecture laboratories and office areas will also be separated for safety and greater efficiency,” said Ms Pelzer.

“Interesting design solutions for the complex needs of the department were found and I foresee that the building and its immediate environment will be an adornment to the Main Campus after its expected completion in 2008,” said Ms Pelzer.

Media release
Issued by: Lacea Loader
Media Representative
Tel:  (051) 401-2584
Cell:  083 645 2454
E-mail:  loaderl.stg@mail.uovs.ac.za
14 September 2006

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept