Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
26 January 2022 | Story Rulanzen Martin | Photo Charl Devenish
The Free State once again excelled in the NSC matric results. Pictured here is a broadcast of a celebratory event held by the FSDoE on the UFS South Campus in 2021 for the matric class of 2020.

The Free State has claimed the top spot in the National Senior Certificate (NSC) examination results for the third consecutive year, with a pass rate of 85,7% in 2021. 

“On behalf of the executive management, staff, and students of the University of the Free State (UFS), I would like to extend our warmest congratulations to you and your executive team on the Free State being the top-achieving province,” Prof Francis Petersen, UFS Rector and Vice-Chancellor, wrote in a congratulatory letter to Dr Tate Makgoe, MEC for Education in the Free State. 

“The UFS is proud to be associated with the Free State Department of Education and we salute you and your team for the many initiatives in schools across the province, which have contributed to the outstanding matric results this year,” Prof Petersen said. 

The UFS will welcome several first-year students on its three campuses in February – many of whom hail from schools in the Free State. The 2021 NSC results were released on 20 January 2022. 
 
Several UFS-led interventions thrive to make impactful change 

The UFS is leading several projects with the Department of Education to address education-related problems in the province. The UFS, through its South Campus, presents the In-Service (InSET) programme, the Internet Broadcast Project (IBP), and the Schools Partnership Project. “It is projects such as these that make a huge difference in the lives of many learners and teachers in our province and that have given so many schools the opportunity to rise to the occasion,” Prof Petersen said. 

The IBP supports learners from 80 schools, with lessons for learners in Grades 8 to 12 being transmitted to three centres across the Free State on a daily basis. Electronic access to learning material is also made possible through the IBP. The Schools Partnership Project, as part of the Social Responsibility Project at the UFS, is focused on the efficacy and quality of school management, subject teaching, and learning development. Well-trained mentors visit project schools on a daily basis, sharing knowledge, materials, and demonstrating the use of technology in an effort to improve the standard of teaching. 

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept