Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
16 October 2023 | Story Michelle Nöthling | Photo iStock
Commemorating World Mental Health Month 2023
The mental health of university students is of growing global concern.

One of the largest student mental health surveys in the world – initiated by Universities South Africa (USAf) in 2020 – found that up to 20% of university students in South Africa need mental health support. The research results also show that up to 77% of students with mental health disorders are not getting help. Contributing reasons include reluctance to seek help due to lingering stigma surrounding mental health, but also limited access. With growing demand and limited capacity, one-on-one therapy does not seem to be a sustainable solution. Some of the recommendations that stem from the report are to introduce a range of digitally based self-help interventions, to provide psychoeducation about when to access help, and to offer peer-to-peer support. This is precisely what the University of the Free State (UFS) Department of Student Counselling and Development (SCD) is now implementing. 

Coinciding with World Mental Health Awareness Month, SCD’s Road Map embodies a paradigm shift in student mental health support. “We want to capacitate students on their mental health journey. Following the Road Map, our students are now able to be active agents in their mental well-being,” says Dr Munita Dunn-Coetzee, SCD Director.

What exactly is this Road Map?

The SCD Road Map guides students to multiple sources of support. On the SCD website, students can delve into a wealth of self-help guides and toolkits that range from academic, emotional, and social well-being to personal challenges and psychological distress. In a commitment to expand the SCD reach beyond one-on-one sessions, the department is offering both in-person and online workshops and development programmes that can be accessed through Blackboard. Additionally, podcasts have been integrated into the SCD offerings to accommodate students' varying schedules and data constraints.

SCD has also partnered with the South African Depression and Anxiety Group (SADAG) to provide a 24/7 toll-free UFS Student Careline. The Careline can be reached in three ways: by calling 0800 00 6363, SMSing 43302, or emailing helpline@sadag.org. In a crisis, help is immediately activated, and assistance is sent to the student.

Another exciting aspect of SCD's Road Map¬ – which further integrates recommendations from the research report – is the shift from individual-centric interventions to group-based support. “We want to expand beyond individual therapy,” Dr Dunn-Coetzee says. “Although one-on-one therapy has an important place in mental health support, we are currently expanding to offer various support groups.” Through these circles of support, SCD aims to foster a culture of mutual learning, peer-to-peer connection, and collective well-being.

The Road Map therefore enables SCD to pivot toward a capacitating approach, equipping students to navigate their mental health journey in a truly collaborative model.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept