Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
18 April 2024 | Story Andre Damons | Photo Charl Devenish
Dr Osayande Evbuomwan
Dr Osayande Evbuomwan, Senior Lecturer and Medical Specialist in the Department of Nuclear Medicine at the University of the Free State (UFS), received the first clinical PhD in nuclear medicine completed at the UFS at the April graduation ceremonies.

Dr Osayande Evbuomwan, Senior Lecturer and Medical Specialist in the Department of Nuclear Medicine, Faculty of Health Sciences, at the University of the Free State (UFS), graduated with the first clinical PhD in nuclear medicine completed at the UFS.

He graduated on Thursday (18 April 2024) at the university’s autumn graduation ceremonies when the Faculty of Health Sciences conferred degrees on its graduation class of 2024.

Dr Evbuomwan, the man behind his department using Lutetium 177 PSMA (Lu-177 PSMA) therapy and now Actinium 225 PSMA therapy to treatment metastatic castrate resistant prostate cancer (MCRPC) – an advanced stage prostate cancer, said his PhD is about using a special radiopharmaceutical called Technetium 99m ECDG to detect active disease in the joints of patients with rheumatoid arthritis (RA).

More opportunities for similar degrees

This research has won him the Society of Nuclear Medicine and Molecular Imaging (SNMMI) International Best Abstract Award for South Africa during last year’s SNMMI 2023 Annual Meeting in the US.

“I am very grateful, and at the same time, proud about this achievement (his PhD). This qualification will definitely give more opportunities for further similar degrees at the department. So yes, I feel very happy and fulfilled.

“Rheumatoid arthritis is a debilitating disease with associated morbidity that can lead to serious joint deformity and destruction. The need for an investigation with a very high diagnostic accuracy in detecting active disease is needed, especially in the detection of subclinical disease. Few prior studies in the literature had shown promising results with Tc 99m ECDG imaging in this regard. So, we decided to conduct a proper prospective study to test this hypothesis,” says Dr Evbuomwan.

This research, he explains, was also aimed at finding out if the new nuclear medicine radiopharmaceutical for the identification of active disease in patients with rheumatoid arthritis can also offer prognostic information. This aspect of the study concluded that this particular radiopharmaceutical (Tc – 99m ECDG) is highly sensitive in identifying synovitis (inflammation of the membrane that protects joints) and is capable of offering prognostic information in patients with rheumatoid arthritis.

This was the first prospective study to assess the prognostic value of this radiopharmaceutical in patients with rheumatoid arthritis, Dr Evbuomwan says.

Researching theranostics in the future

According to him, he had a smooth journey to completing his PhD – something he contributes to support from the fantastic team of three supervisors, the assistant who prepared the radiopharmaceutical, the rheumatology department, the radiographers and nurses at the Department of Nuclear Medicine, and most importantly, his wife and two daughters.

His passion for research, growth and the practice of nuclear medicine were his major motivators on this journey.

Dr Evbuomwan is currently looking at the possibility of starting research on theranostics. The only stumbling block for now, he says, is that the department still does not have a PET/CT camera, as this is very vital in today’s nuclear medicine practice. However, together with the Free State Department of Health, they are working hard to secure one.

“I now want to focus on nuclear medicine therapy and its promotion. This includes both imaging and treatment (theranostics) of certain cancers, most especially prostate cancer, neuroendocrine neoplasms, thyroid cancers and the neuroectodermal tumours. I also want to focus on being involved with the training of more registrars at the department of nuclear medicine and increasing the awareness of nuclear medicine amongst colleagues in the Free State,” says Dr Evbuomwan about his future plans. 

News Archive

Getting out of the dark
2015-04-28

Photo: Leonie Bolleurs

Since 2008, the University of the Free State has been busy with the planning and implementation of projects to reduce the impact of load shedding. To date,  the cost of these projects has run to R6 million. They have been done primarily to ensure that the academic programme does not suffer damage as a result of the increasing interruptions in the power supply that are continuing this year.

The university’s greatest concern has been the provision of emergency power to the lecture halls and laboratories.

Thus far, 35 generators are servicing 55 buildings on the three campuses of the UFS. This includes 26 generators on the Bloemfontein Campus, eight on the Qwaqwa Campus in the Eastern Free State, and one generator on the South Campus in Bloemfontein. The generators are already in service, and are maintained in working order.

Since 2010, the university has also ensured that all newly-built academic buildings are equipped with emergency power supplies.

On the South Campus in Bloemfontein, the new lecture-hall building and the computer laboratory are equipped with emergency power, while the installation of emergency generators in other buildings is under way. The majority of the buildings on the Qwaqwa Campus in the Eastern Free State are equipped with emergency power supplies.

In the meantime, the UFS management has approved a further R11 million for the installation of additional generators on the three campuses. A further R1.5 million has also been approved for the purchase of two mobile generators.

To extend the work already done, the main task will be the installation of more generators on the Bloemfontein Campus to ensure that lecture halls with emergency power will be available for the centrally-arranged timetables, and to ensure that more of the critical laboratories will be provided with emergency power.

There are still  some important buildings and halls on the Bloemfontein Campus that must be supplied with emergency power. However, it is a costly process and must be brought into operation gradually. The further implementation of emergency power depends on the delivery of equipment. The university is also investigating alternative solutions for power provisioning, including solar power.

Generators with spare capacity are optimally deployed to satisfy the lower needs of the campus, including the Odeion, the ANNEX at Microbiology, the Stabilis ANNEX, the Agriculture Building, the UV-Sasol library, and the Francois Retief Building.

In addition, the UFS  is busy on all campuses, coupling area lighting, including

street lights and pedestrian walkways, to existing generators. Procedures for the operation of mechanical equipment, such as entrance gates, lifts, and so on, are currently being dealt with on all campuses. Continuous power sources for certain ICT equipment will be installed on all campuses to protect it against power surges.

Staff and students can also equip themselves with the necessary knowledge to manage load shedding in their specific areas of work and study. It is always helpful to know who to contact. The following list with guidelines and contact numbers has been compiled to assist you:

1. In an emergency, call Protection Services. This line will continue to operate, regardless of whether the power is on or off.
2. Avoid using lifts just before planned load shedding. Some lifts have emergency power packs which will bring the lift to the nearest floor and open the doors. If you still get stuck in a lift during a power outage, use your cellphone to call Protection Services. While you're waiting, stay calm and be patient.
3. If the access control systems in your building stop working after load shedding, contact Protection Services.
4. The students and staff members who are most at risk during load shedding are those in wheelchairs or with other mobility limitations. As far as possible, plan ahead to avoid being stuck on a floor or in a room that is difficult to access when load shedding is imminent. Please contact Protection Services if you need assistance.
5. During a fire, alarms WILL go off. Alarms are not power driven, but battery driven. For assistance, contact Protection Services.
6. The main UFS Switchboard (Bloemfontein Campus +27(0)51 401 9111 and Qwaqwa Campus +27(0)58 718 5000) will continue to operate during load shedding.

Contact details of Protection Services:

  • Bloemfontein Campus: +27(0)51 401 2634/2911
  • Qwaqwa Campus: +27(0)58 508 5460/5175
  • South Campus: +27(0)51 5051217

Communication and Brand Management will make information available on the UFS web, Facebook page, Twitter, Blackboard and the intranet. Get the load shedding schedule from Eskom’s webpage (http://loadshedding.eskom.co.za/). The Bloemfontein Campus falls in group 4 and the South Campus falls in group 2 in Centlec’s load shedding schedule.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept