Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
25 January 2024
EASA conference

The University of the Free State’s Bloemfontein campus played host to the English Academy of Southern Africa’s (EASA) annual international conference on 7-8 December 2023.  Attracting 35 delegates from Canada, the UK, Nigeria, Botswana, and South Africa, the two-day conference delved into the theme, “Ways of Reading: Literature and Literacy,” with a diverse group seeking to unravel the intricate relationship between literature and literacy.

The proceedings were inaugurated by Prof Vasu Reddy, emphasising the importance of exploring how literacy shapes our modes of attention, both culturally and socially. He expressed his faith that the conference would be “generatively disruptive,” noting that “where there is disruption, there is also growth.”

Featuring two eminent keynote speakers, the conference saw Prof David Attwell, Emeritus Professor at the University of York (UK), discussing the connection between translingualism and creativity in a lecture titled, “A Ventriloquial Literature: The Art of ‘Throwing the Voice’ in the South African Canon. On the second day, Dr Karen Jennings, author of the Booker Prize longlisted novel An Island, reflected on “how place and identity are crucial to the act of creation,” with her talk whimsically titled, “Bums in the Ground.”

Delegates approached the conference theme in various ways, with some exploring how specific writers or critical movements have shaped scholarly reading habits. Others highlighted the significance of literacy for social justice. This diversity extended to the interdisciplinary nature of the conference, bringing together scholars working in language practice, literary studies and even the medical humanities.

Convened by Dr Rick de Villiers, a senior lecturer in the Department of English and the regional vice-president of EASA, the conference delighted in attracting scholars from different backgrounds and stages of their careers. “We had a wonderful mix of established and early-career scholars. The atmosphere was rigorous and robust but collegial throughout.”

Speaking on behalf of EASA, Dr De Villiers extended gratitude for the financial and administrative support from the UFS, particularly the Department of English.

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 