Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
01 September 2025 | Story Martinette Brits | Photo Supplied
Engineering
From 2026, the University of the Free State (UFS) will offer its first four-year Bachelor of Engineering (BEng) in Agricultural and Biosystems Engineering, alongside new MSc and PhD programmes in Ecological and Nature-based Engineering Sciences – preparing graduates to address sustainability challenges in food, water, energy, and the environment.

For the first time, the University of the Free State (UFS) will be offering a full four-year engineering degree. From 2026, the Faculty of Natural and Agricultural Sciences will present the Bachelor of Engineering (BEng) in Agricultural and Biosystems Engineering, alongside new PhD and MSc degrees in Ecological and Nature-based Engineering Sciences – the first postgraduate qualifications of their kind on the African continent. Together, these programmes strengthen the university’s role in addressing some of the world’s most pressing and complex sustainability challenges.

Louis Lagrange, BEng Project Manager, describes the new undergraduate degree as a milestone for the university: “It will be the first full engineering degree presented by the UFS, and it directly targets the pressing water–food–energy nexus. It combines hard-core engineering and precision farming digital skills with the living world of biosystems to develop regenerative and environmentally sustainable food production systems.”

The BEng degree is endorsed by the Engineering Council of South Africa (ECSA) and approved by the South African Qualifications Authority (SAQA). It is designed to prepare students for the full agricultural engineering design process – from identifying and evaluating challenges, to designing, implementing, and testing sustainable solutions. Students will also be able to specialise through electives in animal production, horticulture, or open land crop production.

Lagrange explains that the programme offers students hands-on engagement from the start. “They will gain experience in agricultural mechanisations such as drones and GIS, water and irrigation systems, soil and environmental stewardship, renewable energy including solar and biofuels, precision agriculture, data-driven smart farming, and food processing.”

BEng graduates will be well positioned for diverse careers, ranging from agricultural/biosystems engineer, irrigation and water resource engineer, smart farming specialist, and food processing engineer to roles in mechanisation, soil conservation, animal husbandry, and energy conversion. Employers include agribusinesses, consulting engineers, environmental firms, government agencies, and research organisations. 

According to Dr Jacques Maritz, Head of Engineering Sciences, “Our BSc, MSc, and PhD graduates will be uniquely positioned as ecological engineering scientists who can also branch out to advanced sustainability analysts, computational sustainability professionals, or nature-based complexity scientists who will have the future-proof skill of solving complex sustainability challenges in interdisciplinary teams by using some of the most advanced technology.  On the horizon – an NQF 8 postgraduate diploma (PGDip) in Ecological and Nature-based Engineering Sciences to academically link undergraduate students to postgraduate studies.”     

 

Postgraduate degrees: advancing ecological engineering

Alongside this undergraduate development and the existing BSc specialising in Physics with Engineering Subjects, the UFS is also introducing new postgraduate degrees in Ecological and Nature-based Engineering Sciences. “These are the first qualifications of their kind on the African continent and are endorsed by the International Ecological Engineering Society (IEES) and the Ecological Engineering Institute of Africa (EEIA),” explains Dr Maritz.   

Dr Maritz explains: “Ecological engineering applies ecological and complexity science principles to design and restore sustainable ecosystems that integrate human society with the natural environment. These programmes will also strengthen work-integrated learning at the UFS, preparing graduates to address climate resilience, scientifically led biodiversity restoration, pollution remediation through data-driven interventions, and sustainable complex systems development.”

The postgraduate programmes are linked to the UFS’ growing research agenda, which includes plans for a biomass production facility at the UFS Industrial Park to advance scientific circular economy solutions, sustainable energy, and bio-inspired technologies. They also engage with cutting-edge fields such as extreme ecological engineering – creating new ecological functionality in severely degraded environments – and industrial ecological engineering, which reimagines the built environment through green construction materials, circular economy practices, and innovations such as 3D-printed green concrete.

Both Lagrange and Dr Maritz emphasise that these qualifications reflect the UFS’ Vision 130 commitment to being research-led, student-centred, and regionally engaged. They agree that the new programmes are ideally suited for students who want to combine engineering, science, and nature with emerging technologies, while pursuing careers that make a real impact on sustainability in South Africa and beyond.

News Archive

Getting out of the dark
2015-06-10

 

ESKOM is making daily announcements on the status of the power grid.

Anton Calitz, Electrical Engineer at University Estates, is in continuous contact with Eskom and Centlec in an effort to stay abreast of load shedding.

According to Anton, Eskom has recently - the week of 20 April - been focusing on the evening peak, and has announced STAGE 1 load shedding from 17:00-22:00; thus, the Bloemfontein Campus should be able to continue business as usual during the day, except for Thursdays from 18:00 and, possibly, Fridays from 17:00.

Where can I get more information about load shedding stages?

Apart from Eskom’s webpage, staff can also visit GRID WATCH. Click on "Search", then under "Schedules". Look for "Mangaung Local Municipality", and select "GROUP 4". Save this location. “This can even be loaded onto your mobile device.”

“The time slots can be seen for a couple of days in advance, to allow us to plan around the possibility of load shedding in our daily lives,” said Anton.

Please note: ESKOM can change the STAGE level at any time. Therefore, keep an eye on GRID WATCH and News24.

View the typical seven-day planner for the Bloemfontein Campus (Group 4), which indicates the STAGE 2 and 3 possibilities. Take note that, on some days, the STAGE 2 and 3 time slots are the same.

More load shedding tips: Your IT needs

The UFS Data Centre (Computer Room) is fully serviced by a generator facility, and can function without external power supply for a few days.

The generator servicing the UFS data centre does NOT provide power to the outlying facilities. This implies that all digital equipment at gates, booms, and access points will be shut down until the power is restored to these facilities. “We are now, in collaboration with Nico Janse van Rensburg, in a process to install UPS facilities at these points, which will ensure two to three hours of power supply at these points, even during load shedding,” said Dr Vic Coetzee, Senior Director: ICT Services.

No Wi-Fi will be available, as it is dependent on the power supply to the buildings where it is installed.

All servers are contained in the data centre, and will be kept running by our generators.

How to manage load shedding and your IT needs:

1. Get into the habit of saving your work regularly on computer so that you don’t lose your work/files during load shedding.
2. Back up important data. Keep to a schedule of regular back-up.  Make sure your computer back-ups are safe and recoverable.
3. Keep all electronic devices charged and ready to run on battery power. Keep your cellphone charged: some old-style Telkom landlines will still operate during power outages, but others won't.
4. Remember, when power supply is restored, it sometimes happens that a power surge is sent through the network, which will damage your computer.  Fortunately, laptop computers will not suffer this fate as their power is provided through an external power pack. Often, this power pack will be damaged, but not the laptop itself.
5. It makes good sense to reboot your computer daily, not only in terms of power shedding, but also in terms of updating the drivers, software, etc.
6. Switch off all computers and other electrical equipment at the wall plug overnight and on weekends.
7. Should your IT equipment not switch on after a power outage, log a call with the ICT Services. You can also call them at x2000.

More information, guidelines and contact numbers

 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept