20 April 2022 | Story Dr Olivia Kunguma | Photo Supplied
Dr-Olivia-Kunguma
Dr Olivia Kunguma is Lecturer in Strategic Disaster Management, Legal and Institutional Arrangements, and Management of Media Relations and Strategic Communication in the Disaster Management Training and Education Centre for Africa at the University of the Free State (UFS).

Opinion article by Dr Olivia Kunguma, Disaster Management Training and Education Centre for Africa, University of the Free State.
For more than four days, the eastern side of South Africa experienced devastating heavy rainfall, with KwaZulu-Natal (KZN) being hit the hardest. The persistent rains triggered flooding and mudslides. Several compounding impacts of the flooding and mudslides were recorded. The impact includes, but is not limited to, the death of more than 440 people; damage to infrastructure (telecommunication towers, roads, bridges, homes, power lines, etc.); car accidents; business and school closures; and missing people. Most disasters or incidents entail a potentially compounding process where one event leads to another. The stated hazards and impacts also led to a rise in desperate and disgruntled citizens who started protesting and looting. The civil unrest is attributed to the lack of services, such as access to water and electricity.

An incident of this magnitude requires the intervention of disaster management services, whose primary role is to coordinate relevant stakeholders to respond to the situation (Kunguma, 2022). The South African Disaster Management Act, 57 of 2002 (DMA) (as amended, Act 16 of 2015) (Republic of South Africa, 2002), used to manage and coordinate disaster management, mandates the disaster management centres to perform certain functions. One important function to note is the continuous coordination of multiple sectors and disciplines by planning and implementing measures aimed at risk reduction, rapid response, and post-disaster recovery and rehabilitation. 

The DMA is also used to declare certain incidents as disasters. Disasters can be declared in local, provincial, or national spheres of government. Since the flooding mostly affected KZN, there were appeals to declare the event a provincial disaster. The KZN Premier and the Minister of Cooperative Governance (CoGTA) and Traditional Affairs announced at press conferences (eNCA, 2022) that the event would be declared a disaster. The flooding and mudslides were classified as disastrous according to Section 23 of the DMA. This section prescribes that the National Disaster Management Centre must determine whether the event should be regarded as a disaster in terms of the DMA. The NDMC assesses the magnitude and severity of the event and then classify it as a local, provincial, or national disaster. On 13 April, Dr Mmaphaka Tau, the Head of the National Disaster Management Centre, declared the KZN floods a provincial disaster (CoGTA, 2022). A provincial disaster means that the event has affected more than one municipality, enabling the province to deal with the event effectively. 

The declaration of a disaster means that

• available resources such as facilities, vehicles, and funding are released; 
• personnel of the state organ are released to render emergency services; 
• the affected population is evacuated to temporary shelters;
• movement is regulated;
• information is disseminated; 
• temporary lines of communication are maintained or installed; and
• alcohol is suspended or limited in disaster-stricken areas.
Important to note is that the DMA does not apply to an incident that can be dealt with effectively in terms of contingency arrangements or other legislation that can address the consequences of the risk.

Flood relief efforts

The multidisciplinary and multisectoral nature of disaster management has led to several political stakeholders visiting the affected areas to assess the flooding in KZN. This included visits from the Mayor, Premier, Minister of Police, CoGTA Minister, and the President of South Africa. All the disaster management centres in the province have been activated to attend to the disaster. The emergency numbers of the centres were published on Twitter by the Presidency (PresidencyZA, 2022) and other government departments. The centres’ efforts include, but are not limited to, coordinating response; observing and monitoring weather information issued by authorities; disseminating early warning; issuing relief supplies such as blankets; continuing to assess the damage; evacuating the affected to places of safety (for example, all the community halls have been opened for shelter); and clearing up the damage. Stakeholders such as the South African Police Service (SAPS), Gift of the Givers, the South African Social Security Agency (SASSA), and the South African National Defence Force (SANDF) were coordinated by CoGTA (Disaster Management) to provide their services. At this point, the distribution of relief should be based on vulnerability assessments, with no political interference.

Determining the root causes 

The South African Weather Service (SAWS) predicted the expected heavy rainfall in time. The GFS weather forecast model of the United States of America has also predicted severe rainfall along the KZN coast since last week. There was a severe cut-off low system, a common kind of weather system that does not occur regularly but can occur often. In a cut-off low system, the low pressure causes air to rise, and when it does, it reaches a condensation level that forms clouds. When the cut-off low system came down along the coast, another system developed at a high altitude and combined with it, making it more intense. What was unusual, was that the cut-off low became stationary or ‘stalled’ over the KZN coast. Later, the cut-off low started turning more to the southeast. The cut-off low was then reclassified as a tropical cyclone or subtropical depression, named ‘ISSA’. 

In addition, the lack of infrastructure development in the coastal area could also be the cause of the flooding and mudslides. For example, the Isipingo River (Map of Isipingo River, 2022) was channelised with concrete embankments and confined in a narrow space, crossing the N2 in two places, without proper planning of water levees when building the N2 highway. When the river is flooded, the road would turn into a river. This kind of flooding also happened in 2019, so one would have expected the local government to have addressed this matter and that they would have done something about it. The water spills onto the road, as previous heavy seas have blocked the mouth of the river, and only a strong momentum of the river flow can break through the built-up sand. 

The flooding in residential areas such as Kloof and Hillcrest is due to the development of complexes that take up the natural land space where grass or trees would have allowed the water to penetrate the topsoil easily. In complexes, more than 50% of the area is covered with pavements and solid roofs that concentrate the run-off water, which drains into a channel not designed for that amount of water. The sudden fast-flowing water then quickly erodes the soil. Many places on the sides of the roads have concrete embankments, while other parts in between are without embankments. These open parts are where the water broke through, and landslides occurred on the various roads. These damages can also be attributed to developments on the top of the hills. “The town planners should not permit new complexes covering 70% of the area without considering redevelopment of water run-off and drainage management,” said Prof Sue Walker, an agricultural meteorologist at the University of the Free State, and a principal researcher at the Agricultural Research Council. 

Ms Nonala Ndlovu, the KZN CoGTA spokesperson, shared with eNCA News the possible causes of the flooding. The flooding is attributed to the poor drainage systems, exacerbated by littering in the communities. She, however, indicated that the non-stop rain was unprecedented and that even if the drainage systems were well serviced, it would still not be able to handle the high volume of water. She added that buildings in low-lying areas could not handle the influx of water (eNCA, 2022).

Flood recovery and future prevention

Investment in disaster risk reduction (DRR) efforts is needed more than disaster response efforts. Although the occurrence of heavy rain was predicted in time, the damage it caused showed that this timely prediction was ineffectual. Systematic approaches are needed to prepare for, prevent, and mitigate the frequency or severity of losses and damage caused by flooding. Surely, attention needs to be paid to research-informed town planning, building codes, land zoning, public awareness, flood legislation, and flood early warning systems, to name a few. 

Since disaster management has shown that it plays a leading and active role in responding to disasters, it also needs to play a leading role in reducing the risks. The KZN floods have exposed significant socio-economic and environmental vulnerabilities that require immediate attention if effective risk reduction is to be achieved.

UFS-DIMTEC is requesting donations of non-food items for the victims of the the KZN flood disaster. To donate, please contact Dr Tlou Raphela on +27 72 108 4987 or RaphelaTD@ufs.ac.za 

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     