02 January 2024 | Story Leonie Bolleurs
UFS scientists contribute to the battle against cancer
From top left, moving clockwise: Dr Nerina van der Merwe, Dr Osayande Evbuomwan, Prof Alicia Sherriff, Profs Andreas Roodt and Alice Brink.

Cancer stands as a prominent contributor to deaths worldwide, with a big impact on families and communities. Prostate cancer is one of the leading causes of mortality in the world. The recent diagnoses of cervical cancer are 10 702 annually, with 5 870 patients passing away. Female breast cancer surpassed lung cancer as the most commonly diagnosed cancer in 2020 (American Cancer Society), representing 11,7% of all cancer cases, making it the fifth leading cause of cancer mortality worldwide. Researchers at the university are doing their part in the fight against cancer.

Treating prostate cancer

In July 2021, Dr Osayande Evbuomwan, Senior Lecturer and Medical Specialist in the Department of Nuclear Medicine, along with a team of university doctors, initiated patient treatment using radioligand therapy (RLT). This targeted nuclear medicine therapy delivers high radiation levels precisely to cancer cells, minimising damage to normal organs and tissue, a benefit not typically provided by conventional therapies.

It was the first time that Lutetium 177 PSMA – a type of PRRT – has been used to treat patients with metastatic castrateresistant prostate cancer (MCRPC) in the Free State, providing hope when standard treatments and conventional therapy are not an option. This treatment generally enhances quality of life, slows disease progression, and extends overall survival, with minimal side effects.

All three patients treated with Lu 177 PSMA so far have completed at least four therapy cycles and tolerated it well. The first two patients, while initially responding well, sadly passed away due to unrelated causes. The third case stands out as the most successful, responding excellently to seven treatment cycle and remaining in good health.

Dr Evbuomwan recently also obtained a license for a more effective therapy, AC 225 PSMA, as an alternative to Lu 177 PSMA.

Precise cervical cancer therapy

Medical personnel at the Universitas Academic Hospital also became the first in Southern Africa to use interstitial brachytherapy as a method for treating cervical cancer. Prof Alicia Sherriff, Head of the Department of Oncology, explains that brachytherapy – a form of internal radiation therapy – places the radiation source near or inside the cancer. “Precise delivery of curative doses to the cancer protects surrounding organs such as the bladder, rectum, and small bowel,” she explains.

Three to five weekly brachytherapy sessions under conscious sedation usually begins after two weeks of daily external beam radiation. On brachytherapy days, external beam radiation is not administered. “The intracavitary brachytherapy applicators are placed within the cervix and uterus and deliver high doses locally, but for surrounding tissue infiltration, additional needles are inserted via the Venezia applicator, delivering high-dose radiation while sparing organs,” says Prof Sherriff.

Their work aligns with the broader goals of the university and its commitment to advancing health care in the region by ensuring the continued growth of their skills and technology, while applying these skills to improve the possibility of disease control, cure or palliation with quality of life.

Familial breast and ovarian cancer testing

Dr Nerina van der Merwe, a principal medical scientist in the Division of Human Genetics, and colleagues are engaged in breast cancer research. They are involved in translational research using new technologies that, once validated as a first-tier diagnostic test, could revolutionise genetic testing for familial breast and ovarian cancer in South Africa when used in conjunction with genetic counselling. This parallel application is ideally suited for primary hospitals and rural clinics, as it will dramatically increase accessibility and uptake of genetic testing in rural areas.

By performing first-tier genetic testing at a community clinic, patients no longer have to be transported to tertiary hospitals for testing, and more patients and related family members who are unaware of a familial predisposition will be reached. “By warning unaffected related individuals about their potential increased risk, we can play a part in the earlier detection or diagnosis of patients, improving their cancer survival rate,” states Dr Van der Merwe.

Patenting cancer research

Prof Andreas Roodt, a retired Distinguished Professor in the Department of Chemistry, and colleagues – particularly Prof Alice Brink and co-worker Prof Roger Alberto from the University of Zurich – have published widely on the chemistry of radiopharmaceutical models. Since the 2000s, the world has introduced the concept of ‘theranostics,’ which involves the use of a single compound for both cancer detection and therapy. “These compounds contain a radioisotope that provides internal radiation for cancer detection (diagnostic) and a second part for treatment,” explains Prof Roodt.

Their research enables the high-yield preparation of compounds containing multiple isotopes often present in very low concentrations. “This allows combining diagnostic isotopes such as technetium-99m (used in >80% of diagnostic patient studies worldwide) with therapeutic radioisotopes, such as rhenium-186 (used for bone cancer therapy), with ease. Many therapeutic radioisotopes do not have good diagnostic radiation; thus, by combining the two types of radioisotopes in one medicine, the oncologist can now clearly see where the therapeutic part is going and apply more effective treatment,” he says.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 